My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Preliminary Geotechnical Information
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Preliminary Geotechnical Information
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:28:40 AM
Creation date
6/16/2020 8:24:56 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY GEOTECHNICAL INFORMATION <br />Page 2 <br />Earth Mechanics, Inc. <br />March 20, 2018 <br />Lowering the groundwater table locally, for a temporary period, to an elevation just below the <br />pile cap elevation may be required (to construct the pile caps). If CIDH piles are used for deep <br />foundations, pile construction will require the wet method (slurry) of construction or installing <br />temporary casing. Whether slurry or casing is used, groundwater will be expelled from each pile <br />hole due to slurry or concrete displacing the groundwater. The expelled groundwater will need <br />to be temporarily stored, tested for contaminants, and properly disposed. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.