My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A River Hydraulics Analysis
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A River Hydraulics Analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:39:19 AM
Creation date
6/16/2020 8:24:58 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prado RSM RAS Model -Levee 2a Plan: 1) PropBr RS50863 <br />2/26/2019 <br />SAR 50863 FAIRVIEW AVE. Bridge <br />.014 <br />Legend <br />.................. --- <br />EG PF 1 <br />WS PF 1 <br />Crit PF 1 <br />100 <br />■ <br />Ground <br />• <br />Bank Sta <br />---------------------------- ------------------------------------------ ---------------------------------------------------------------------------------- - ---------------------------- <br />c <br />90 <br />(D <br />w <br />80 <br />70 <br />0 50 100 150 200 <br />250 <br />300 <br />Station (ft) <br />Prado RSM RAS Model -Levee 2a Plan: 1) PropBr RS50863 <br />2/26/2019 <br />SAR 50815 D/S FAIRVIEW. <br />.014 <br />Legend <br />.................. --- <br />EG PF 1 <br />Crit PF 1 <br />WS PF 1 <br />100 <br />Ground <br />• <br />Bank Sta <br />° <br />90 <br />............. ......... <br />w <br />80 <br />70 <br />0 50 100 150 200 <br />250 <br />300 <br />Station (ft) <br />1 in Horiz. = 50 ft 1 in Vert. = 10 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.