My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A River Hydraulics Analysis
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A River Hydraulics Analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:39:19 AM
Creation date
6/16/2020 8:24:58 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fairview Street Improvements <br />approximately 300 feet. <br />In conclusion, the results show no impact to upstream and downstream structures and confirm that the <br />proposed Fairview Avenue bridge provides some improvement to the local hydraulics. <br />REFERENCES <br />1. US Army Corps of Engineers, Hydrologic Engineering Center, River Analysis System, HEC-RAS <br />5.0.6. November 2018. <br />2. OC Streetcar, Santa Ana / Garden Grove Project, Santa Ana River Hydraulics Study Memo, <br />submitted by HNTB Corporation, to Orange County Transportation Authority, June 2017. <br />3. U.S. Army Engineer District Los Angeles Corps of Engineers, Lower Santa Ana River Channel, <br />District File No.239/798-890 As -built, March 1993. <br />4. HEC-RAS Baseline Model (BlowPrdoSIAM02) <br />J:\356.07.17\RIVER HYDRAULICS\RIVER HYDRAULICS REPORT TEXT.DOC Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.