My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Water Quality Memo
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Water Quality Memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:28:40 AM
Creation date
6/16/2020 8:25:28 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 1 <br />MEMORANDUM <br />DATE: September 16, 2019 <br />TO: Brian Liu, Associate Environmental Planner, California Department of <br />Transportation, District 12 <br />FROM: Nicole West, Associate Environmental Planner, LSA <br />SUBJECT: Water Quality Memorandum: Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project BRLS 5063(184) <br />1.0 PROJECT DESCRIPTION <br />The City of Santa Ana, in conjunction with Caltrans District 12, proposes to widen Fairview Street <br />between 9th Street and 16th Street, including replacing the Fairview Street bridge crossing over the <br />Santa Ana River (proposed Project) in Santa Ana, California. The purpose of the Project is to reduce <br />congestion and improve pedestrian and bicyclist safety on Fairview Street between 9th Street and 16th <br />Street, consistent with the Orange County Master Plan of Arterial Highways and the City’s General Plan <br />Circulation Element. <br />South of 9th Street, Fairview Street provides three lanes in each direction which are reduced to two <br />lanes in each direction north of 9th Street, across the existing four-lane bridge, to 16th Street. The <br />Fairview Street segment between 9th Street and 16th Street is the only constraint for Fairview Street to <br />be built out to its planned width of six lanes. This condition causes a traffic “bottleneck” during peak <br />hours. In addition, there are no sidewalks, bikeways, or lighting on the existing bridge. Pedestrians and <br />bicyclists currently use the roadway shoulder to cross the bridge. <br />The Santa Ana River Trail (SART) runs on both sides of the Santa Ana River in the Project area. The SART <br />is a Section 4(f) Resource and would be temporarily closed during construction of the proposed Project. <br />The proposed Project includes widening Fairview Street between 9th Street and 16th Street, including <br />replacing the Fairview Street bridge over the Santa Ana River. The proposed Project would widen <br />Fairview Street from two lanes in each direction to three lanes in each direction in the City of Santa Ana <br />(refer to Figures 1 and 2; all figures are provided in Attachment A). Fairview Street bridge would be <br />replaced with a new six-lane bridge (three lanes in each direction), including a complete bridge deck <br />with barrier rails, sidewalks, bicycle lanes, a raised median, and lighting. <br />The proposed bridge would be expanded from approximately 52 feet (ft) to 100 ft in width, and would <br />have the same roadway profile as the existing bridge. The eight pier walls that support the existing <br />bridge would be removed, and four new pier walls would be constructed to support the new bridge. <br />The proposed Project would acquire partial right-of-way take from three parcels (two commercial <br />parcels [Assessor’s Parcel Numbers (APN) 405-213-02 and 405-213-01] and one single-family residence <br />[APN 405-213-14]) as shown in Figure 2.
The URL can be used to link to this page
Your browser does not support the video tag.