Laserfiche WebLink
<br /> <br /> 23 <br />shall specify the BMPs to be incorporated into the project design to target pollutants of concern in <br />runoff from the project area. The City of Santa Ana shall ensure that the BMPs specified in the Final <br />WQMP are incorporated into the final project design. <br />6.0 REFERENCES <br />California Department of Water Resources (DWR). 2004. California’s Groundwater, Bulletin 118 –South <br />Coast Hydrologic Region, Coastal Plain of Orange County Groundwater Basin. February. <br />City of Santa Ana. 1982. General Plan, Conservation Element. (Reformatted 2010.) <br />———. 1969. Municipal Code. December 1. (updated November 2018) <br />Civil Works Engineers, Inc. 2019a. Fairview Avenue Widening & Bridge Replacement River Hydraulics <br />Analysis (February 2019) <br />Civil Works Engineers, Inc. 2019b. Draft Water Quality Management Plan (WQMP) - Fairview Street <br />Widening & Bridge Replacement (February 2019) <br />County of Orange. 2011. Model Water Quality Management Plan. May 19. <br />———. 2013. Technical Guidance Document for the Preparation of Conceptual/Preliminary and/or <br />Project Water Quality Management Plans (WQMPs). May 19. <br />———. 2012. Susceptibility Map Update. Susceptibility Analysis—Santa Ana River. December. <br />County of Orange, the Cities of Orange County, and the Orange County Flood Control District. 2003. <br />Drainage Area Management Plan. July 1. <br />County of Orange, Stormwater Program. 2012. Construction Runoff Guidance Manual for Contractors, <br />Project Owners, and Developers. December. <br />Earth Mechanics, Inc. 2018. Preliminary Geotechnical Information. March 20. <br />Federal Emergency Management Agency (FEMA). 2009. Flood Insurance Rate Map (FIRM) No. <br />0659C0144J. December 3. <br />LSA. 2018a. Natural Environmental Study (Minimal Impacts) for Fairview Street Improvements from 9th <br />Street to 16th Street and Bridge Replacement Project. December <br />LSA. 2018b. Jurisdictional Delineation Report for Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project. June. <br />LSA. 2019a. Historic Property Survey Report for Fairview Street Improvements from 9th Street to 16th <br />Street and Bridge Replacement Project. <br />LSA. 2019b. Historic Resources Evaluation Report for Fairview Street Improvements from 9th Street to <br />16th Street and Bridge Replacement Project.