Laserfiche WebLink
<br />Road Construction Emissions Model, Version 9.0.0 <br />Daily Emission Estimates for ->Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases (Pounds)ROG (lbs/day)CO (lbs/day)NOx (lbs/day)PM10 (lbs/day)PM10 (lbs/day)PM10 (lbs/day)PM2.5 (lbs/day)PM2.5 (lbs/day)PM2.5 (lbs/day)SOx (lbs/day)CO2 (lbs/day)CH4 (lbs/day)N2O (lbs/day)CO2e (lbs/day) <br />Grubbing/Land Clearing 1.23 10.12 14.07 5.60 0.60 5.00 1.58 0.54 1.04 0.02 2,168.39 0.58 0.05 2,196.72 <br />Grading/Excavation 6.46 49.70 73.92 8.28 3.28 5.00 4.01 2.97 1.04 0.10 9,821.59 2.87 0.13 9,930.72 <br />Drainage/Utilities/Sub-Grade 3.59 30.59 36.66 6.78 1.78 5.00 2.69 1.65 1.04 0.06 5,766.76 1.20 0.10 5,826.67 <br />Paving 1.66 17.72 17.04 1.00 1.00 0.00 0.88 0.88 0.00 0.03 3,257.86 0.75 0.13 3,315.28 <br />Maximum (pounds/day)6.46 49.70 73.92 8.28 3.28 5.00 4.01 2.97 1.04 0.10 9,821.59 2.87 0.13 9,930.72 <br />Total (tons/construction project)1.15 9.30 12.73 1.71 0.59 1.12 0.77 0.53 0.23 0.02 1,809.79 0.48 0.03 1,830.52 <br /> Notes: Project Start Year ->2019 <br />Project Length (months) ->24 <br />Total Project Area (acres) ->1 <br />Maximum Area Disturbed/Day (acres) ->1 <br />Water Truck Used? ->Yes <br />Phase Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck <br />Grubbing/Land Clearing 0 0 0 0 200 40 <br />Grading/Excavation 0 0 0 0 800 40 <br />Drainage/Utilities/Sub-Grade 0 16 0 30 560 40 <br />Paving 0 64 0 120 400 40 <br />CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. <br /> <br />Total Emission Estimates by Phase for ->Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases <br />(Tons for all except CO2e. Metric tonnes for CO2e)ROG (tons/phase)CO (tons/phase)NOx (tons/phase)PM10 (tons/phase)PM10 (tons/phase)PM10 (tons/phase)PM2.5 (tons/phase)PM2.5 (tons/phase)PM2.5 (tons/phase)SOx (tons/phase)CO2 (tons/phase)CH4 (tons/phase)N2O (tons/phase)CO2e (MT/phase) <br />Grubbing/Land Clearing 0.03 0.27 0.37 0.15 0.02 0.13 0.04 0.01 0.03 0.00 57.25 0.02 0.00 52.61 <br />Grading/Excavation 0.77 5.90 8.78 0.98 0.39 0.59 0.48 0.35 0.12 0.01 1,166.81 0.34 0.01 1,070.28 <br />Drainage/Utilities/Sub-Grade 0.28 2.42 2.90 0.54 0.14 0.40 0.21 0.13 0.08 0.00 456.73 0.10 0.01 418.64 <br />Paving 0.07 0.70 0.67 0.04 0.04 0.00 0.04 0.04 0.00 0.00 129.01 0.03 0.01 119.10 <br />Maximum (tons/phase)0.77 5.90 8.78 0.98 0.39 0.59 0.48 0.35 0.12 0.01 1166.81 0.34 0.01 1,070.28 <br />Total (tons/construction project)1.15 9.30 12.73 1.71 0.59 1.12 0.77 0.53 0.23 0.02 1809.79 0.48 0.03 1,660.64 <br />CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. <br />The CO2e emissions are reported as metric tons per phase. <br />Daily VMT (miles/day) <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. <br />Fairview Street Widening <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Fairview Street Widening <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. <br />Total Material Imported/Exported <br />Volume (yd3/day)