My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix B Air Quality Modeling Worksheets
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix B Air Quality Modeling Worksheets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:28:40 AM
Creation date
6/16/2020 8:25:48 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Road Construction Emissions Model, Version 9.0.0 <br />Daily Emission Estimates for ->Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases (Pounds)ROG (lbs/day)CO (lbs/day)NOx (lbs/day)PM10 (lbs/day)PM10 (lbs/day)PM10 (lbs/day)PM2.5 (lbs/day)PM2.5 (lbs/day)PM2.5 (lbs/day)SOx (lbs/day)CO2 (lbs/day)CH4 (lbs/day)N2O (lbs/day)CO2e (lbs/day) <br />Grubbing/Land Clearing 0.70 13.37 2.47 5.13 0.13 5.00 1.15 0.11 1.04 0.02 2,178.49 0.58 0.05 2,207.37 <br />Grading/Excavation 3.04 59.14 7.11 5.42 0.42 5.00 1.38 0.34 1.04 0.10 9,831.45 2.87 0.13 9,941.11 <br />Drainage/Utilities/Sub-Grade 1.72 34.57 5.13 5.29 0.29 5.00 1.27 0.23 1.04 0.06 5,780.69 1.21 0.10 5,841.34 <br />Paving 1.00 19.85 4.74 0.22 0.22 0.00 0.17 0.17 0.00 0.03 3,289.71 0.75 0.14 3,348.82 <br />Maximum (pounds/day)3.04 59.14 7.11 5.42 0.42 5.00 1.38 0.34 1.04 0.10 9,831.45 2.87 0.14 9,941.11 <br />Total (tons/construction project)0.56 10.90 1.50 1.21 0.08 1.12 0.30 0.07 0.23 0.02 1,813.59 0.48 0.03 1,834.53 <br /> Notes: Project Start Year ->2019 <br />Project Length (months) ->24 <br />Total Project Area (acres) ->1 <br />Maximum Area Disturbed/Day (acres) ->1 <br />Water Truck Used? ->Yes <br />Phase Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck <br />Grubbing/Land Clearing 0 0 0 0 200 40 <br />Grading/Excavation 0 0 0 0 800 40 <br />Drainage/Utilities/Sub-Grade 0 16 0 30 560 40 <br />Paving 0 64 0 120 400 40 <br />CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. <br /> <br />Total Emission Estimates by Phase for ->Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust <br />Project Phases <br />(Tons for all except CO2e. Metric tonnes for CO2e)ROG (tons/phase)CO (tons/phase)NOx (tons/phase)PM10 (tons/phase)PM10 (tons/phase)PM10 (tons/phase)PM2.5 (tons/phase)PM2.5 (tons/phase)PM2.5 (tons/phase)SOx (tons/phase)CO2 (tons/phase)CH4 (tons/phase)N2O (tons/phase)CO2e (MT/phase) <br />Grubbing/Land Clearing 0.02 0.35 0.07 0.14 0.00 0.13 0.03 0.00 0.03 0.00 57.51 0.02 0.00 52.87 <br />Grading/Excavation 0.36 7.03 0.84 0.64 0.05 0.59 0.16 0.04 0.12 0.01 1,167.98 0.34 0.02 1,071.40 <br />Drainage/Utilities/Sub-Grade 0.14 2.74 0.41 0.42 0.02 0.40 0.10 0.02 0.08 0.00 457.83 0.10 0.01 419.70 <br />Paving 0.04 0.79 0.19 0.01 0.01 0.00 0.01 0.01 0.00 0.00 130.27 0.03 0.01 120.31 <br />Maximum (tons/phase)0.36 7.03 0.84 0.64 0.05 0.59 0.16 0.04 0.12 0.01 1167.98 0.34 0.02 1,071.40 <br />Total (tons/construction project)0.56 10.90 1.50 1.21 0.08 1.12 0.30 0.07 0.23 0.02 1813.59 0.48 0.03 1,664.27 <br />CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. <br />The CO2e emissions are reported as metric tons per phase. <br />Daily VMT (miles/day) <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. <br />Fairview Street Widening - Mitigated <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Fairview Street Widening - Mitigated <br />PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. <br />Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. <br />Total Material Imported/Exported <br />Volume (yd3/day)
The URL can be used to link to this page
Your browser does not support the video tag.