My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERNATIONAL LINE BUILDERS, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
INTERNATIONAL LINE BUILDERS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 10:59:27 AM
Creation date
6/19/2020 7:01:03 PM
Metadata
Fields
Template:
Contracts
Company Name
INTERNATIONAL LINE BUILDERS, INC.
Contract #
P 17-6894
Agency
Public Works
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-6894 <br />EUCLID STREET AT HAZARD AVENUE SIGNAL MODIFICATION <br />FEDERAL PROJECT NO: HSIPL 5063 (171) <br />DIFFERING SITE CONDITIONS <br />The undersigned, is submitting this proposal for performing by contract the work required by these <br />bid documents, certify to comply with the following: <br />a. Contractor's Notification <br />Promptly notify the Agency's Engineer if you find either of the following conditions: <br />I. Physical conditions differing materially from either of the following: <br />• Contract documents <br />• Job site examination <br />2. Physical conditions of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as <br />inherent in the work provided for in the Contract <br />Include details explaining the information you relied on and the material <br />differences you discovered. If you fail to promptly notify the Engineer, you waive <br />the differing site condition claim for the period between your discovery of the <br />differing site condition and your notification to the Engineer. <br />If you disturb the site after discovery and before the Engineer's investigation, you <br />waive the differing site condition claim. <br />b. Engineer's Investigation and Decision <br />Upon your notification, the Engineer investigates job site conditions and: <br />1. Notifies you whether to resume affected work <br />2. Decides 0 the condition differs materially and is cause for an <br />payment, or both <br />Signed <br />Title Earnest Brown- President So Cal Div. <br />Firm International Line Builder's, Inc. <br />Date 02/26/2020 <br />P-36 of P-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.