Laserfiche WebLink
City of Santa Ana <br />page z <br />Euclid <br />Street at Hazard Avenue Signal Modification (17-6894 (HSIPL 5063(171))), bidding on February 26, 2020 <br />200 PM <br />Panted 04/1512020 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code UOM <br />oty <br />Unit Price <br />Line Total <br />Comment <br />4 <br />Install 4" PVC per plan <br />'.. <br />LF <br />360 <br />$41,00 <br />$14,760,00 <br />5 <br />Install New or Replace Existing No. 6 Pull Box <br />EA <br />7 <br />$566.00 <br />$3,962.00 <br />6 <br />Install New or Replace Existing No. 6E Pull Box <br />EA <br />1 <br />$886.00 <br />$886.00 <br />7 <br />24 Strand SMFO Cable <br />LF <br />1000 <br />$2,00 <br />$2,000.00 <br />8 <br />IP Communication System <br />LS <br />1 <br />$12,458,00 <br />$12.458.00 <br />'.. '.. <br />9 <br />Construct ADA Curb Ramp Per Plan <br />SF <br />1243 <br />$26.00 <br />$32,318.00 <br />10 <br />Pothole for Utility Not Shown <br />EA <br />6 <br />$589.00 <br />$3,534.00 <br />11 <br />Pothole for U0111y for Traffic Signal Pole Locations <br />EA <br />2 <br />$220.00 <br />$440.00 <br />12 <br />Furnish and Install Temporary Overhead Wiring <br />LS <br />1 <br />$5,706.00 <br />$5,706.00 <br />13 <br />Signing and Striping <br />LS <br />1 <br />$54,621.00 <br />$54,621.00 <br />.' <br />14 <br />Furnish and Install Type E Traffic Loop Detector (with DLC)' <br />EA <br />10 <br />$482.00 <br />$4,820.00 <br />15 <br />Furnish and Install Type D Traffic Loop Detector (with DLC)' <br />EA <br />6 <br />$511,00 <br />$3,066.00 <br />16 <br />Furnish and Install Type Q Traffic Loop Detector (with DLC)' <br />EA <br />1 <br />$521.00 <br />$521.00 <br />17 <br />Labor Agreement Oversight <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Subtotal <br />$255,620.00 <br />Add Alternative One <br />18 <br />Install Video Dection System at Euclid Street $ Hazard Avenue <br />'.. <br />LS <br />1 <br />$28,794.00 <br />$28,794.00 <br />Subtotal <br />$28,794.00 <br />Base Bid Asterisk Notes per P-2 of Specifications - NOT part <br />of Base Bid Calculation <br />