Laserfiche WebLink
REVENUE <br />FY 20-21 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />53600 <br />116) <br />Accessibility PC - 8,000 sf - Structural Plan Check <br />sq. ft. <br />0.10 <br />51601 <br />117) <br />Accessibility PC - 8,000 sf - Inspection <br />sq. ft. <br />0.05 <br />53600 <br />118) <br />Change of Use b) <br />deposit <br />874.53 <br />53600 <br />119) <br />Code Modification - simple <br />flat <br />955.06 <br />53601 <br />53602 <br />53603 <br />53600 <br />120) <br />Code Modification - moderate <br />flat <br />1,910.14 <br />53601 <br />53602 <br />53603 <br />53600 <br />121) <br />Code Modification - complex <br />flat <br />3,820.30 <br />53601 <br />53602 <br />53603 <br />53600 <br />122) <br />Notice of Violation - Structural Plan Check New <br />hourly <br />239.34 <br />51601 <br />123) <br />Permit Issuance Fee - EMP and Misc. Building <br />flat <br />59.30 <br />51602 <br />51603 <br />51604 <br />51601 <br />124) <br />Permit Issuance Fee - Residential and Non Residential <br />flat <br />158.15 <br />51600 <br />125) <br />Permit Issuance Fee - General Plan Update surcharge D <br />flat <br />23.79 <br />51601 <br />126) <br />Permit Renewal/Extension Fee <br />flat <br />86.33 <br />51602 <br />(per permit renewed or extended) <br />51603 <br />51604 <br />51601 <br />127a) <br />Residential Photovoltaic System (1kW to 15kW) <br />flat <br />450.00 <br />Plus each additional kW over 15kW <br />each <br />15.00 <br />127b) <br />Residential Thermal Systems (lkwth to 10 kwth) <br />flat <br />450.00 <br />Plus each additional kWth over 10kWth <br />each <br />15.00 <br />127c) <br />Commercial Rooftop Solar (1kW to 50kW) <br />flat <br />1,000.00 <br />Plus each additional kW over 50kW up to 250 kW <br />each <br />7.00 <br />Plus each additional kW over 250kW <br />each <br />5.00 <br />127d) Commercial Thermal Systems (1kWth up to 30kwth) <br />flat <br />1,000.00 <br />Plus each additional kWth between 30kWth up to 260kWth <br />each <br />7.00 <br />Plus each additional kWth over 260kW <br />each <br />5.00 <br />53600 <br />128) <br />Solar Panel - Structural Plan Check <br />hourly <br />239.34 <br />51601 <br />129) <br />Solar Panel - Inspection Residential <br />flat <br />352.57 <br />51601 <br />130) <br />Solar Panel - Inspection Commercial <br />flat <br />1,062.48 <br />51601 <br />131) <br />Field Plan Check - subject to field Structural Plan Check <br />hourly <br />172.65 <br />53600 <br />132) <br />Cell Tower - Structural Plan Check <br />hourly <br />239.34 <br />53600 <br />133) <br />Deferred Submittal - Structural Plan Check <br />hourly <br />239.34 <br />53600 <br />134) <br />Rooftop equipment - Structural Plan Check <br />hourly <br />239.34 <br />53600 <br />135) <br />Equipment Changeout - Structural Plan Check <br />hourly, min 1/2 hr <br />239.34 <br />53600 <br />136) <br />Dust Collecting - Structural Plan Check <br />hourly <br />239.34 <br />53600 <br />137) <br />Above/Below Ground Tank - Structural Plan Check <br />hourly <br />239.34 <br />53600 <br />i 138) <br />Trash Enclosures - Structural Plan Check <br />flat <br />239.34 <br />• <br />