Laserfiche WebLink
REVENUE <br />FY 20-21 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />164) Refunds <br />49.84 <br />Upon written request from the permittee, refunds of permit <br />fees may be made to the permittee in an amount equal to 80% <br />of the permit fee, exclusive of the plan check and issuance <br />fee; except that no permit fees shall be refunded under any <br />of the following circumstances: <br />(1) 180 days has elapsed from the date of the issuance <br />of the permit <br />(2) inspections have been performed by the Building Safety <br />Division <br />If a permit has been issued for a project located in an area <br />outside of the jurisdiction of the City, 100% of the permit <br />and plan check fee may be refunded. If a permit has been <br />erroneously issued, 100% of the permit and plan check fee <br />may be refunded. <br />If a plan check fee has been paid and the plan is withdrawn <br />by the applicant prior to the plan check, refunds of plan <br />check fees may be made to the permittee in an amount equal <br />to 100% of the plan check fee in excess of $49.84 paid. <br />In no other case may any plan check fees be refunded. <br />Waiver of Fee <br />No permit or plan check fees required by this resolution will <br />be charged for public improvement projects performed by <br />construction contractors and subcontractors pursuant to contract <br />with the City of Santa Ana or the Community Redevelopment <br />Agency of the City of Santa Ana nor for any work performed by <br />employees of the City in the course of their employment. <br />However, this fee waiver does not exempt any party from <br />obtaining a permit for such work nor exempt such party from <br />conforming to the procedures established by the City nor from <br />compliance with all applicable City and State ordinances <br />regulating such work. <br />Note: The volume for Plan Check activity has been reduced to reflect the fact that <br />contract services and overtime are used to complete a portion of activity. <br />a) Not all re -roofing activities require plan check. Material and current structure design <br />will be the deciding factor. <br />b) This service will be charged an initial deposit and then charged by hourly rate. <br />`) These services were reallocated across fee areas as an overhead. <br />d) Up to 10 racks. Each additional rack will be charged at $12.83 each. <br />12.83 <br />e) Hourly rates will be charged after the minimum is met, if required. <br />f) This revenue is earmarked for the General Plan Update and is not included in new revenue figures. <br />All plan check services reflect an initial plus two rechecks. Additional reviews will be charged on an <br />hourly basis. Any unique plan check or inspection that does not match a service category will be <br />charged on an hourly basis. <br />Electrical Fees <br />51603 <br />165) Permit Issuance <br />59.30 <br />51603 <br />166) Minimum Fee (Nonresidential) <br />79.06 <br />53601 <br />167) Electrical Plan Check Fee (when required) <br />65% of Subtotal <br />51603 <br />168) 125 Volt Receptacle Outlets <br />1.57 <br />51603 <br />169) Light Switches, Occupancy Sensors <br />1.70 <br />51603 <br />170) Light Fixtures <br />1.13 <br />51603 <br />171) Air Conditioners, Heat Pumps <br />104.40 <br />51603 <br />172) Factory -Wired Units (Solid Hook -Ups) <br />26.71 <br />51603 <br />173) Dedicated Circuits (15 or 20 AMP Receptacles) <br />26.71 <br />51603 <br />174) Time Clock, Photo -Cell, Time Switch <br />13.03 <br />51603 <br />175) Track -Light, Cable Tray, Special Raceway, Plugmold, <br />26.71 <br />Under -Floor Duct, Plug -In Busways, Wiremold, Etc. Each 100 ft. <br />30 <br />