My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 3:59:32 PM
Creation date
6/23/2020 8:58:23 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2020-112
Agency
PUBLIC WORKS
Council Approval Date
6/2/2020
Expiration Date
6/30/2025
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C-0-2038 <br />MACARTHUR BOULEVARD 1 TALBERT AVENUE— RTSSP <br />ARTICLE 4 RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENC�f <br />The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the <br />implementation of the PROJECT: <br />A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, procure, <br />and complete the PROJECT as identified in APPLICATION. <br />B. To coordinate outreach with PARTICIPATING AGENCIES for PROJECT. <br />C. To collect all data necessary to provide new optimized timing plans including, but not <br />limited to, manual or video all movement counts at each PROJECT signalized intersection, and a mutually <br />agreed upon number and location of twenty-four (24) hour J seven (7) day automated machine traffic <br />counts with vehicle classification. <br />D. To develop and implement new timing plans optimized for signal synchronization. <br />E. To provide updated timing plans for all control systems and all relevant data used to <br />develop said plans to PARTICIPATING AGENCIES. <br />F. To prepare a "Before and After Study" for PROJECT as described in the Measure M2 <br />Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />B.111,9) for PROJECT. The AUTHORITY shall provide the "Before and After Study" to the <br />PARTICIPATING AGENCIES in draft and final formats for review and comment. Party comments shall <br />be noted in the final study. If specified in APPLICATION, AUTHORITY shall provide a "Before and After <br />Study" video of a representative portion of PROJECT at up to two (2) public meetings. <br />ARTICLE 5 RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />funding of PROJECT: <br />A. Provide a technical representative to meet and participate as a member of the <br />PROJECT's Traffic Forum. <br />L;%Camm10LERICALVWORDIPROCkAGREr AG02038 <br />Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.