My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (27)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 3:59:25 PM
Creation date
6/23/2020 9:05:39 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2020-111
Agency
Public Works
Council Approval Date
6/2/2020
Expiration Date
6/30/2025
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-0.2037 <br />EDINGER AVENUE — RTSSP <br />1 ARTICLE 4 RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY <br />2 The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the <br />3 Implementation of the PROJECT: <br />4 A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, procure,. <br />6 and complete the PROJECT as Identified In APPLICATION, <br />6 B. To coordinate outreach with PARTICIPATING AGENCIES for PROJECT. <br />7 C. To collect all data necessary to provide new optimized timing plans including, but not <br />8 limited to, manual or video all movement counts at each PROJECT signalized intersection, and amutually <br />9 agreed upon number and location of twenty-four (24) hour f seven (7) day automated machine traffic <br />10 counts with vehicle classification. <br />11 D. To develop and implement new timing plans optimized for signal synchronization. <br />12 E. To provide updated timing plans for all control systems and all relevant data used to <br />13 develop said plans to PARTICIPATING AGENCIES. <br />14 F. To prepare a "Before and After Study" for PROJECT as described in the Measure M2 <br />16 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />16 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No, 3, Section <br />17 B,111.9) for PROJECT, The AUTHORITY shall provide the "Before and After Study" to the <br />18 PARTICIPATING AGENCIES in draft and final formats for review and comment. Party comments shall <br />19 be noted in the final study. If specified in APPLICATION, AUTHORITY shall provide a'Before and After <br />20 Study` video of a representative portion of PROJECT at up to two (2) public meetings. <br />21 ARTICLES. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />22 PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />23 funding of PROJECT: <br />24 A. Provide a technical representative to meet and participate as a member of the <br />25 PROJECT's Traffic Forum, <br />F�'111� <br />Page 6 of 15 <br />L:ICammCLERICAL6WORDVROCwGREE1AG02037 <br />
The URL can be used to link to this page
Your browser does not support the video tag.