My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY WATER DISTRICT (OCWD)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY WATER DISTRICT (OCWD)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 3:02:25 PM
Creation date
6/29/2020 3:00:05 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY WATER DISTRICT (OCWD)
Contract #
A-2020-103
Agency
PUBLIC WORKS
Council Approval Date
5/19/2020
Expiration Date
5/18/2050
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) disposal of waste materials generated by the Treatment <br />System, including landfill costs and incineration, and costs <br />of hazardous waste disposal (if applicable); <br />(10) sewerage costs associated with maintenance/backwash of <br />the Treatment System; and <br />(11) such other reasonable maintenance costs as are necessary to <br />ensure the Treatment System continues to operate properly <br />consistent with its design. <br />D. Non -reimbursable costs include: <br />(1) existing Producer staff time costs not attributable to the <br />PEAS Treatment Facilities; <br />(2) direct or indirect overhead type expenses for staff; and <br />(3) cost resulting from a Producer's inadequate operation and <br />maintenance of the Treatment System. <br />E. Reimbursement Rate Adiustment. The $75/acre foot rate will be <br />automatically adjusted annually each July 1 (beginning July 1, 2021) by the percentage differential <br />based on the last two annual indices set forth in the Bureau of Labor Statistics Consumer Price <br />Index for All Urban Consumers - Los Angeles -Long Beach -Anaheim. The maximum O&M <br />reimbursement rate may be increased by OCWD if there are unforeseen, unique or specific <br />circumstances of the Treatment System that, through no fault of a Producer, result in a higher cost <br />of treatment at a Producer's treatment system, including increased costs attributable to new <br />statutes, regulations or regulatory interpretations. <br />F. Submittals; Reimbursement Timing. OCWD shall reimburse each <br />Producer its allowable O&M costs incurred by a Producer within 60 days of receiving the <br />Producer's annual O&M unit cost calculation and supporting information as described in <br />Section 6.2.B. via direct payment. <br />G. Treatment Media. OCWD may solicit and enter into a future <br />contract with the appropriate activated carbon, resin, and/or other adsorption media manufacturers <br />to obtain a lower price for this material than could be obtained by the individual Producer. Unless <br />a Producer opts out in writing of this Section within 30 days of the Effective Date, Producer will <br />support and participate in OCWD efforts to obtain a lower cost for activated carbon and/or resin. <br />6.3 Grants. <br />A. OCWD-Sought. OCWD may seek federal, state, or other grant <br />funding to offset costs of the PEAS program contemplated by this Agreement. Each Producer <br />shall support and assist OCWD, as may be reasonably requested by OCWD, to obtain any grants <br />that maybe used by OCWD to fund construction and/or future O&M of Treatment Systems. Grant <br />2629/022499-0087 -1 1- <br />14979764.1 a04/1720 <br />
The URL can be used to link to this page
Your browser does not support the video tag.