Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-9002 <br />BUSH STREET BICYCLE BOULEVARD <br />CITY ESTIMATE <br />UNIT <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />QTY. <br />PRICE <br />COST <br />FURNISH AND INSTALL <br />TRAFFIC SIGNAL PULLBOX <br />WITH NEW NO. 6 PULLBOX <br />22 <br />PER CSA STD. PLAN NO. <br />EA <br />4 <br />$ $3, 250. 00 <br />$ $13, 000. 00 <br />1501. ADJUST TO FINISH <br />GRADE <br />FURNISH AND INSTALL <br />$3,250.00 <br />23 <br />NEW WATER METER BOX <br />EA <br />2 <br />$ <br />$ $6, 500. 00 <br />PER CSA STD. PLAN 1401. <br />8" PCC CROSS GUTTER <br />INCLUDING MONOLITHIC <br />$26. 00 <br />24 <br />SF <br />2,800 <br />$ <br />$ $ 7z, eoo. oa <br />CURB PER CSA STD. PLAN <br />1109 <br />CONSTRUCT NEW <br />CULVERT PER CSA STD. <br />25 <br />PLAN NO.318 WITH ATYPE <br />EA <br />1 <br />$ $1,300.00 <br />$ $1,300.00 <br />II INLET. <br />REMOVE EXISTING CATCH <br />BASIN STRUCTURE <br />COMPLETE AND PROTECT <br />26 <br />EXISTING CONNECTOR <br />EA <br />1 <br />$$1,950.00 <br />$ $1,950.00 <br />PIPE IN PLACE. FILL AND <br />COMPACT REMOVAL WITH <br />NATIVE. <br />REMOVE EXISTING <br />27 <br />PARKING METER <br />EA <br />1 <br />$ $1,300.00 <br />$ $1,300.00 <br />COMPLETE. <br />POUR NEW VENT <br />FOUNDATION PER SCE STD. <br />28 <br />PLAN AC 758 AT FINISH <br />EA <br />4 <br />$ $650.00 <br />$ $2,600.00 <br />GRADE. PROTECT VENT IN <br />PLACE. <br />REMOVE EXISTING <br />FIREHYDRANT AND <br />29 <br />VALVE, INSTALL NEW FIRE <br />EA <br />2 <br />$ $650.00 <br />$ $1,300.00 <br />HYDRANT AND VALVE PER <br />CSA STD. PLAN 1405. <br />30 <br />CONSTRUCT 12" PVC <br />LF <br />30 <br />$76.00 <br />$ <br />$ $z, 3aa. o0 <br />WATER MAIN (3- MIN.) <br />P-3 of P-20 <br />