My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - RES STREET REPAIR PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
07/07/2020
>
23A - RES STREET REPAIR PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 4:38:18 PM
Creation date
7/2/2020 4:31:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
7/7/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAST WORK REFERENCES <br />2015 <br />City of Hawthorne Hawthrone Blvd Reconstruction <br />4455 W. 162"' Street Contract Amount: $12,579,000.00 <br />Hawthorne, CA 90250 Start: 4/2014 <br />Contact: Heecheol Kwon, (310) 349-2980 Completed: 5/2015 <br />City of Inglewood <br />One Manchester Blvd, 3" Floor <br />Inglewood, CA 90301 <br />Contact: Hunter Nguyen, (310) 412-4252 <br />County of Ventura <br />800 S. Victoria Ave <br />Ventura, CA 93009 <br />Contact: Jeewoong Kim, (805) 654-3987 <br />City of Montclair <br />51 1 1 Benito Street <br />Montclair, CA 91763 <br />Contact: Steve Stanton, (909) 625-9444 <br />Riverside County Transportation Commission <br />4080 Lemon Sweet, 3" t Floor <br />Riverside, CA 92501 <br />Contact: Bill Seitz, (949) 300-9132 <br />City of Riverside <br />3900 Main Street <br />Riverside, CA 92501 <br />Contact: Steve Howard, (951) 826-5708 <br />Long Beach Unified School District <br />2201 E. Market Street <br />Long Beach, CA 92805 <br />Contact: Nancy Chinchilla, (562) 997-7513 <br />Florence Ave <br />Contract Amount: $2.639,000.00 <br />Start: 4/2015 <br />Completed: 10/2015 <br />Pavement Resurfacing, Phase II <br />Contract Amount: $2,401,970.00 <br />Start: 4/2015 <br />Completed: 10/2015 <br />Northeast Montclair Street Rehabilitation <br />Contract Amount: $514,150.00 <br />Start: 4/2015 <br />Completed: 7/2015 <br />Route 74 Widening <br />Contract: $1,970,004.00 <br />Start: 4/2014 <br />Completed: 7/2015 <br />2014/15 Arterial Streets <br />Contract Amount: $1,693,076.00 <br />Start: 4/2015 <br />Completed: 9/2015 <br />Garfield Elementary School Pavement <br />Contract Amount: $1,976,508.00 <br />Start: 6/2015 <br />Completed: 1 1 /2015 <br />23A-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.