My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CROWN CASTLE FIBER, LLC
Clerk
>
Contracts / Agreements
>
C
>
CROWN CASTLE FIBER, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 2:30:27 PM
Creation date
7/15/2020 1:45:53 PM
Metadata
Fields
Template:
Contracts
Company Name
CROWN CASTLE FIBER, LLC
Contract #
A-2020-118
Agency
PUBLIC WORKS
Council Approval Date
6/2/2020
Expiration Date
6/14/2030
Insurance Exp Date
4/1/2021
Destruction Year
2035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7CD73A60-3C9D-4785-9DC5-9A381151512D <br />late payment charges if payments are made by mail. Notwithstanding the foregoing, upon <br />agreement of the parties, Licensee may pay the License Fee (or Alternate License Fee, if <br />applicable) by electronic funds transfer and if agreed, the Licensor will provide to Licensee bank <br />routing information for such purpose upon request of Licensee. <br />5.4 Delinquent Payment. A ten percent (10%) late fee shall be added to the License <br />Fee (or Alternate License Fee, if applicable) if not received by Licensor within thirty (30) calendar <br />days after the due date. In addition, all unpaid fee shall accrue interest on the amount due at the <br />rate of ten percent (10%) per annum accruing as of the first day following the expiration of the <br />foregoing 30-day period until paid in full. All late charges and interest payments shall become <br />License Fee (or Alternate License Fee, if applicable) under this Agreement. <br />5.5 Additional Remedies. The late fee set forth in Section 5.4 above is not exclusive, <br />and does not preclude the Licensor from pursuing any other or additional remedies in the event <br />that payments become overdue by more than 30 days. <br />6. CONSTRUCTION. Licensee shall comply with all applicable federal, state, and local codes <br />related to the construction, installation, operation, maintenance, and control of Licensee's <br />Equipment installed on Municipal Facilities, including the installation of Replacement Facilities <br />where authorized. Except as provided in Section 6.7, Licensee shall not attach, install, maintain, <br />or operate any Equipment on Municipal Facilities without the prior written approval of an <br />authorized representative of the Licensor for each location as evidenced in a signed Supplement. <br />Licensee shall keep the Municipal Facilities free and clear from any liens arising out of any work <br />performed, material furnished or obligations incurred by or for Licensee. <br />6.1 Installation and Operation. On a quarterly basis, Licensee must furnish to <br />Licensor a current list and map that identifies the exact location of the Equipment in or on the <br />Municipal Facility. That information must be provided in a format established by the Licensor and <br />that is compatible with Licensor's information technology, including but not limited to ESRI <br />compatible GIS shapefiles. <br />6.2 Design Standards. The Equipment and any Replacement Facility shall comply <br />with the standards and guidelines for wireless facilities in the public right-of-way established by <br />the Director of Public Works pursuant to Section 33-234 of the Santa Ana Municipal Code. All <br />future Supplements, Supplement renewals, and modifications to existing Equipment shall be <br />subject to such updated standards. <br />6.3 Obtaining Required Permits. Licensee acknowledges that in addition to a signed <br />Supplement, each installation of Equipment and maintenance shall also be subject to then -current <br />City permitting requirements as set out in the City's Municipal Code. Licensee agrees to comply <br />with the current applicable ordinances regarding such installations and maintenance as well as any <br />future regulations that may be adopted by the City respecting such installations and maintenance. <br />Licensee shall apply for the appropriate permits and pay any standard and customary permit fees. <br />6.4 Make Ready <br />6.4.1 Make Ready Work and Costs <br />Page 9 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.