Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
4. <br />Corporate Yard: 215 S. Center Street <br />4: Dover Hydraulic Passenger, 2 stop <br />$ 90000 <br />per month <br />5. <br />City Hall (Wheelchair Lift): 20 Civic Center Plaza <br />EXAMINATION AND LUBRICATION ONLY <br />QUARTERLY SERVICE <br />1: Wheel-O-Vator, 2 stop chair lift <br />$ 22500 <br />per quarter <br />6. <br />Santa Ana Zoo: 1801 Chestnut Place <br />1: Schindler Elevator, 2 stop <br />$ 250.00 <br />per month <br />7. <br />Santa Ana Transportation Center: 1000 E. Santa Ana Blvd. <br />4: Schindler Hydraulic, 4, 3, 2 stop <br />$ 1.100.00 <br />per month <br />8' <br />El Salvador Community Center: 1825 W. Civic Center Dr <br />QUARTERLY SERVICE <br />1: Wheel-O-Vator, 2 stop chair lift <br />$ 225.00 <br />per quarter <br />9 <br />Police DepartmenUHolding: 60 Civic Center Dr <br />10: 8 Traction Elevator; 2 Hydro Electric 4 stop; 1 dumb <br />waiter <br />5.oso 00 <br />$ <br />per month <br />10. <br />Southwest Senior Center: <br />QUARTERLY SERVICE <br />1: 1 wheelchair lift at stage <br />$ 22500 <br />per quarter <br />TOTAL ANNUAL COST: <br />Sub -Total Monthly (Line items 1,2,3,4,6,7,9 x 12 months): <br />$ 113.700.00 <br />Sub -Total Quarterly (Line Items 5, 8 and 10 x 4): <br />$ 2,700.00 <br />TOTAL ANNUAL COST (Sum of both sub -totals above): <br />$ 116.400-00 <br />LABOR RATES <br />Same Business Day Service Calls (service calls made by 1:00 p.m. PST). <br />The Contractor shall quote labor rates and provide explanation as re uired herein: <br />11. <br />Straight Time Mechanic$300.00 per hour <br />Team: $500.00 per hour <br />$ See to the left <br />per hour <br />12. <br />Over Time Mechanic $510.00 per hour <br />Team: $950.00 per hour <br />$ See to the left <br />per hour <br />13. <br />Double Time Mechanic: $600.00 per hour <br />Team: $950.00 per hour <br />$ See to the left <br />perhour <br />Next Business Day Service Calls (service calls made after 1:00 p.m. PST). <br />The Contractor shall quote labor rates and provide explanation as re uired herein: <br />14. <br />Mechanic. $300.00 per hour <br />Straight Time Team: S500.00 per hour <br />$ See to the left <br />per hour <br />15. <br />Over Time Mechanic $510.00 per hour <br />Team: $950.00 per hour <br />$ See to the left <br />er hour <br />16. <br />Double Time a aoic per our <br />$ See to the left <br />City of Santa Ana - RPP 20-068 <br />Elevator Maintenance <br />22 <br />