My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 4:00:03 PM
Creation date
7/21/2020 12:18:10 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
N-2020-118
Agency
PUBLIC WORKS
Expiration Date
7/24/2040
Insurance Exp Date
1/1/1900
Destruction Year
2045
Notes
RETURN ORIGINAL EXECUTED COPY TO COTC. INSURANCE NOT ON FILE WORK MAY NOT PROCEED.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE: OC-285 <br />EXHIBIT "B" <br />This License is subject to the following additional terms and conditions: <br />The Licensee agrees to execute and deliver to SCRRA, prior to commencing any work within <br />the rail right-of-way, SCRRA Temporary Right -of -Entry agreement (Form No. 6) and deliver and <br />secure approval of the insurance required by the two exhibits attached to SCRRA Form No.6. <br />If the Licensee retains a contractor to perform any of work within the rail right-of-way, then the <br />Licensee shall incorporate in its contract documents SCRRA Form No. 6 and Rules and <br />Requirements for Construction on Railway Property (SCRRA Form No. 37). Mr. Christos <br />Sourmelis with SCRRA's Right -of -Way Encroachments Office can be reached at (909) 394- <br />3418. These forms can be accessed through SCRRA's website www.metrolinktrains.com, <br />("About Us", "Engineering and Construction", and "Manuals"). <br />2. Licensee's contractor, at its sole cost and expense, shall obtain and maintain, in full force and <br />effect, insurance as required by SCRRA during the entire construction period. The Contractor <br />shall furnish copies of the insurance certificates to all affected operating railroads. <br />3. If the personnel working on this project do not have CURRENT, SCRRA Safety Training <br />Certification — Safety training is required for all work near or within the railroad right of way. <br />Licensee's contractor shall contact Mr. Trevor Williams with Jacobs Engineering at 714-659- <br />1141 to schedule RWP safety training. The contractor will need a valid SCRRA project number, <br />located in the upper right-hand comer of the executed SCRRA Right -of -Entry Permit. No work <br />may commence on the railroad right of way until this training has been completed <br />Flagging services are limited due to projects SCRRA has going on within the SCRRA Right -of <br />Way. Jacobs Engineering requests the contractor to arrange flagging services a minimum of <br />fifteen working days prior to beginning work. Although every effort is made to accommodate the <br />contractor's schedule, prior notification does not guarantee the availability of protective services <br />for the proposed date of work. Contractor shall contact Mr. Dale Stuart Jr. with Jacobs <br />Engineering at 1-213- 305-8424 to schedule (EIC) Flagging Services. The contractor will need <br />a valid SCRRA project number, located in the upper right-hand comer of the Right -of -Entry. <br />5. Licensee or licensee's contractor shall be responsible for the location and protection of any and <br />all surface, sub -surface, and overhead lines and structures. <br />6. The applicant andlor the contractor shall follow SCRRA rules and regulations, addressed in <br />"Rules and Requirements for Construction on Railway Property" (SCRRA Form 37). "Form 37 <br />can be found on our website at: <br />https://www.metrolinktrains.com/alobalassets.about.engineering.scrra form no 37.pdf <br />Any and all excavations will adhere to SCRRA's Excavation Support Guidelines. SCRRA's <br />Excavation Support Guidelines can be found on our website at: <br />htts://www.metrolinktrains.com/globalassets/aboutten,gineerina/scrra excavation <br />support auidelines.pdf <br />8. If Traffic Control will be utilized, the temporary traffic control plans shall be prepared, signed and <br />sealed by a California Licensed Civil or Traffic Engineer. Temporary traffic control will comply <br />Page 13 of 15 <br />1497338.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.