Laserfiche WebLink
FILE: OC-285 <br />EXHIBIT "B" <br />This License is subject to the following additional terms and conditions: <br />The Licensee agrees to execute and deliver to SCRRA, prior to commencing any work within <br />the rail right-of-way, SCRRA Temporary Right -of -Entry agreement (Form No. 6) and deliver and <br />secure approval of the insurance required by the two exhibits attached to SCRRA Form No.6. <br />If the Licensee retains a contractor to perform any of work within the rail right-of-way, then the <br />Licensee shall incorporate in its contract documents SCRRA Form No. 6 and Rules and <br />Requirements for Construction on Railway Property (SCRRA Form No. 37). Mr. Christos <br />Sourmelis with SCRRA's Right -of -Way Encroachments Office can be reached at (909) 394- <br />3418. These forms can be accessed through SCRRA's website www.metrolinktrains.com, <br />("About Us", "Engineering and Construction", and "Manuals"). <br />2. Licensee's contractor, at its sole cost and expense, shall obtain and maintain, in full force and <br />effect, insurance as required by SCRRA during the entire construction period. The Contractor <br />shall furnish copies of the insurance certificates to all affected operating railroads. <br />3. If the personnel working on this project do not have CURRENT, SCRRA Safety Training <br />Certification — Safety training is required for all work near or within the railroad right of way. <br />Licensee's contractor shall contact Mr. Trevor Williams with Jacobs Engineering at 714-659- <br />1141 to schedule RWP safety training. The contractor will need a valid SCRRA project number, <br />located in the upper right-hand comer of the executed SCRRA Right -of -Entry Permit. No work <br />may commence on the railroad right of way until this training has been completed <br />Flagging services are limited due to projects SCRRA has going on within the SCRRA Right -of <br />Way. Jacobs Engineering requests the contractor to arrange flagging services a minimum of <br />fifteen working days prior to beginning work. Although every effort is made to accommodate the <br />contractor's schedule, prior notification does not guarantee the availability of protective services <br />for the proposed date of work. Contractor shall contact Mr. Dale Stuart Jr. with Jacobs <br />Engineering at 1-213- 305-8424 to schedule (EIC) Flagging Services. The contractor will need <br />a valid SCRRA project number, located in the upper right-hand comer of the Right -of -Entry. <br />5. Licensee or licensee's contractor shall be responsible for the location and protection of any and <br />all surface, sub -surface, and overhead lines and structures. <br />6. The applicant andlor the contractor shall follow SCRRA rules and regulations, addressed in <br />"Rules and Requirements for Construction on Railway Property" (SCRRA Form 37). "Form 37 <br />can be found on our website at: <br />https://www.metrolinktrains.com/alobalassets.about.engineering.scrra form no 37.pdf <br />Any and all excavations will adhere to SCRRA's Excavation Support Guidelines. SCRRA's <br />Excavation Support Guidelines can be found on our website at: <br />htts://www.metrolinktrains.com/globalassets/aboutten,gineerina/scrra excavation <br />support auidelines.pdf <br />8. If Traffic Control will be utilized, the temporary traffic control plans shall be prepared, signed and <br />sealed by a California Licensed Civil or Traffic Engineer. Temporary traffic control will comply <br />Page 13 of 15 <br />1497338.1 <br />