My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:06:54 AM
Creation date
7/27/2020 9:06:46 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
P 20-6970
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 20-6970 <br />OMNIBUS CONCRETE REPAIRS <br />STATEMENT REGARDING "ANTI -KICKBACK" REOUIREMENTS <br />The undersigned is submitting this proposal for performing by contract the work required by <br />these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as <br />supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that <br />each contractor or subcontractor shall be prohibited from inducing, by any means, any person <br />employed in the construction or repair of public work, to give up any part of the compensation to <br />which he/she is otherwise entitled. <br />Signed: <br />Title: Thomas Nanci, President <br />Firm: EBS General Engineering, Inc. <br />Date: <br />P-15 ofP-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.