My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAMEXX CONSTRUCTION (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARAMEXX CONSTRUCTION (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 5:03:13 PM
Creation date
7/31/2020 2:05:56 PM
Metadata
Fields
Template:
Contracts
Company Name
ARAMEXX CONSTRUCTION
Contract #
P 17-6801
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Kristine Ridge <br />To: City Manager <br />Nabil Saba, <br />Executive Director <br />From: Public Works Agency <br />Project No. 17-6801; Civic Center Bike Blvd. <br />Subject: Change Order No. 1 <br />CONTRACTOR: Aramexx Construction <br />532 W First St. Unit 202 <br />Claremont, CA 91711 <br />Date: May 11, 2020 <br />PROJECT DESCRIPTION: Project No. 17-6801; Civic Center Bike Blvd. <br />CHANGE ORDER NUMBER: 1 CHANGE ORDER AMOUNT: $43,590.45 <br />ACCOUNTING UNIT -ACCOUNT -ACTIVITY NUMBER: 14817613-66220-17680102028 <br />JUSTIFICATION <br />The contractor was directed in the field to remove and replace (6") of <br />asphalt concrete for an area of 2,718.00 SF. As well as, cold mill and <br />overlay (2") for a 1,245.00 SF area. This is due to the fact that the south <br />side of French Street is not at the proper depth to meet ADA requirements. <br />As a result, the south side of French Street needed to be lowered and <br />repaved to the proper depth. <br />CONTRACT COST SUMMARY <br />Amount <br />Original Contract Total $2,856,418.00 <br />% of <br />AGREED PRICE <br />$43,590.45 <br />Construction Contingency $300,160.00 10.5% <br />Council Authorized budget $3,156,578.00 <br />Amount <br />Original Contract Total $2,856,418.00 <br />Previous Change Orders $0 <br />% of Contract <br />Change Order#1 $43,590.46 Increase 1.5% <br />Adjusted Contract Total $2,900,008.46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.