My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUCAS BUILDERS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LUCAS BUILDERS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 4:18:02 PM
Creation date
7/31/2020 2:07:47 PM
Metadata
Fields
Template:
Contracts
Company Name
LUCAS BUILDERS, INC.
Contract #
P 19-6426
Agency
Public Works
Council Approval Date
7/7/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Compensate the contractor for costs associated with slurry backfill from Station 14+15 to Station <br />14+39, approximately twenty-four linear feet (PCO No. 34). <br />TOTAL COST = $4,927.00 <br />6) Compensate the contractor for costs associated with an unmarked water and utility lines at <br />Station 17+40 during construction per PCO No. 36. <br />TOTAL COST = $12,827.94 <br />7) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in <br />order to provide a structural base for the pavement section per PCO No. 39. <br />TOTAL COST = $4,975.00 <br />8) To compensate the contractor for costs associated with the removal of an increased asphalt <br />street section along Bush Street per PCO 40. <br />TOTAL COST = $8,850.00 <br />9) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in <br />order to provide a structural base for the pavement section per PCO No 41. <br />TOTAL COST = $5,849.53 <br />TOTAL AGREED PRICE _ $118,487.98 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.