Laserfiche WebLink
5) Compensate the contractor for costs associated with slurry backfill from Station 14+15 to Station <br />14+39, approximately twenty-four linear feet (PCO No. 34). <br />TOTAL COST = $4,927.00 <br />6) Compensate the contractor for costs associated with an unmarked water and utility lines at <br />Station 17+40 during construction per PCO No. 36. <br />TOTAL COST = $12,827.94 <br />7) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in <br />order to provide a structural base for the pavement section per PCO No. 39. <br />TOTAL COST = $4,975.00 <br />8) To compensate the contractor for costs associated with the removal of an increased asphalt <br />street section along Bush Street per PCO 40. <br />TOTAL COST = $8,850.00 <br />9) Compensate the contractor for costs associated with crushed aggregate base in lieu of sand in <br />order to provide a structural base for the pavement section per PCO No 41. <br />TOTAL COST = $5,849.53 <br />TOTAL AGREED PRICE _ $118,487.98 <br />Page 2 of 3 <br />