My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYM ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
HYM ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:01:01 AM
Creation date
8/4/2020 4:23:06 PM
Metadata
Fields
Template:
Contracts
Company Name
HYM ENGINEERING, INC.
Contract #
P 18-6903
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rk%bp eIR� Man# <br />2280 South Lilac Ave <br />Bloomington Ca 92316 <br />Phone: (909) 746-0356 Fax: (909) 746-0354 <br />Contractors Llcense No. 374000 <br />DIR Registration No. 1000000306 <br />A General Engineering <br />C-13 Fence, Wire, wood <br />0-32 Highway Improvement <br />Quotation Union Contractor / No minority Status <br />• EXCLUDE: Maintenance of temporary delineation Is. temporary paint, temporary tape, channelizers, etc... <br />• ALL Bid Items shall NOT be adjusted or removed without written / or verbal permission. <br />• EXCLUDE: Lead Compliance Plan <br />• Retainage percentage on monthly progress payments to be no greater than the percentage retained by the Owner on Its <br />payment to the Contractor. If Owner reduces the retainage percentages on payments to the Contractor, the Contractor shall <br />likewise reduce the retainage percentage on payment to Chrisp Company. Full retention to be released no later than thirty, <br />(30) Days after completion of Chrisp Companys work. Excessive or delinquent retalnage will be subject to the highest <br />Interest rate allowed by law. <br />• Chrisp Company shall be reimbursed the full amount for bonds upon submission to General Contractor. Retention shall not <br />be held from bond reimbursement. <br />• THIS QUOTATION IS BASED ON A STANDARD MONDAY THROUGH FRIDAY WORK WEEK, ADDITIONAL COSTS WILL <br />OCCUR FOR WORK PERFORMED ON WEEKENDS <br />• CHRISP COMPANY WILL USE EXISTING EMPLOYEE POOL TO PERFORM ALL WORK ON THIS PROJECT. IF THERE ARE <br />ANY HIRING GOALS FOR THIS PROJECT THIS WILL BE EXCLUDED <br />•'' General Contractor to Provide Clean Water Source At No Cost to Chrisp Company. Must be Located On Jobsite. <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.