My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYM ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
HYM ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 10:01:01 AM
Creation date
8/4/2020 4:23:06 PM
Metadata
Fields
Template:
Contracts
Company Name
HYM ENGINEERING, INC.
Contract #
P 18-6903
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Kristine Ridge <br />To: City Manager Date: May 3, 2021 <br />Nabil Saba, Executive Director <br />From: Public Works Agency <br />Project No. 18-6903; Hazard Avenue Protected Bike Lanes (CIVIL 182) <br />Subject: Change Order No. 1 <br />CONTRACTOR: HYM Engineering Inc. <br />1559 W. Commonwealth Ave. <br />Fullerton, CA 92833 <br />PROJECT DESCRIPTION: Project No. 18-6903; Hazard Protected Bike Lanes (CIVIL 182) <br />CHANGE ORDER NUMBER: 1 CHANGE ORDER AMOUNT: $16,353.75 <br />ACCOUNTING UNIT -ACCOUNT -ACTIVITY NUMBER: 05917660-66220-18690302028 <br />03217662-66220-18690303028 <br />JUSTIFICATION <br />1. As a result, of revising channelization plan to install delineators and to add <br />signage along the Hazard Avenue project limits. (PCO #3) <br />CONTRACT COST SUMMARY <br />Original Contract Total <br />Amount <br />$882,919.00 <br />AGREED PRICE <br />$16,353.75 <br />% of Contract <br />Construction Contingency $88,340.00 10.0% <br />Council Authorized budget $971,259.00 <br />Amount % of <br />Original Contract Total $882,919.00 <br />Previous Change Orders $0 <br />Change Order #1 $16,353.75 Increase 1.85% <br />Adjusted Contract Total $899,272.75 1.85% <br />
The URL can be used to link to this page
Your browser does not support the video tag.