Laserfiche WebLink
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />APRIL 2020 <br />FAIRVIEW BRIDGE REPLACEMENT ANG STREETIMPROVEMENTS L S A <br />($TH STREET TO IETN STREET) PACT ECT <br />SANTA ANAL CALIEORWA <br />2.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED <br />The environmental factors checked below would be potentially affected by this Project, involving at <br />least one impact that is a "Potentially Significant Impact" as indicated by the checklist in Chapter 3.0. <br />❑ Aesthetics ❑ Agriculture/Forestry Resources <br />❑ Biological Resources ❑ Cultural Resources <br />❑ Geology/Soils <br />❑ Greenhouse Gas Emissions <br />❑ Hydrology/Water Quality <br />❑ Land Use/Planning <br />❑ Noise <br />❑ Population/Housing <br />❑ Recreation <br />❑ Transportation <br />❑ Utilities/Service Systems <br />❑ Wildfire <br />2.1 DETERMINATION <br />On the basis of this initial evaluation: <br />❑ Air Quality <br />❑ Energy <br />❑ Hazards & Hazardous Materials <br />❑ Mineral Resources <br />❑ Public Services <br />❑ Tribal Cultural Resources <br />❑ Mandatory Findings of Significance <br />❑ 1 find that the proposed Project COULD NOT have a significant effect on the environment, and a <br />NEGATIVE DECLARATION will be prepared. <br />® I find that although the proposed Project could have a significant effect on the environment, <br />there will not be a significant effect in this case because revisions in the Project have been made <br />by or agreed to by the Project proponent. A MITIGATED NEGATIVE DECLARATION will be <br />prepared. <br />❑ 1 find that the proposed Project MAY have a significant effect on the environment, and an <br />ENVIRONMENTAL IMPACT REPORT is required. <br />❑ 1 find that the proposed Project MAY have a "Potentially Significant Impact" or "Potentially <br />Significant Unless Mitigated" impact on the environment, but at least one effect (1) has been <br />adequately analyzed in an earlier document pursuant to applicable legal standards, and (2) has <br />been addressed by mitigation measures based on the earlier analysis as described on attached <br />sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects <br />that remain to be addressed. <br />❑ I find that although the proposed Project could have a significant effect on the environment, <br />because all potentially significant effects (a) have been analyzed adequately in an earlier <br />ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION pursuant to applicable <br />standards, and (b) have been avoided or mitigated pursuant to that earlier ENVIRONMENTAL <br />IMPACT REPORT or NEGATIVE DECLARATION, including revisions or mitigation measures that are <br />imposed upon the proposed Project, nothing further is required. <br />j <br />Kenny guyen, P.E., for Civil Engineer Date <br />R:\WgE1202\ISMND\Public Review Draft ISMND\Fairview Street Bridge Public Review Draft ISMND.d=x (04/01/20) 2-1 <br />75B-33 <br />