My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/18/2020 Adjourned Meeting
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
8/11/2020 9:03:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NT <br />MENTS <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEW BPIOGE REVLACEM REST TO STREET BEET) PROJECT <br />L S A <br />MAY 2020 (9Tx STREET To ANTx STREET) L, OLEGT <br />SANTA ANAL CALIFOPHIA <br />Construction. Construction of the proposed Project would require the use of energy to fuel <br />grading vehicles, trucks, and other construction vehicles. All or most of this energy would be <br />derived from nonrenewable resources. Construction activities are not anticipated to result in an <br />inefficient use of energy, as gasoline and diesel fuel would be supplied by construction <br />contractors who would conserve the use of their supplies to minimize their costs on the <br />proposed Project. Energy usage on the Project site during construction would be temporary in <br />nature and would be relatively small in comparison to the State's available energy sources. <br />Therefore, construction energy impacts would be less than significant. No mitigation is required. <br />Operation. Typically, energy consumption is associated with fuel used for vehicle trips and <br />natural gas and electricity use. Energy use consumed during operation of the proposed Project <br />would be associated with fuel used for vehicle trips and electricity consumption associated with <br />the proposed Project. Operation of the proposed Project would not require the consumption of <br />natural gas. <br />The purpose of the proposed Project is to reduce congestion and improve pedestrian and <br />bicyclist safety on Fairview Street between 9th Street and 16th Street, consistent with the <br />Orange County Master Plan of Arterial Highways and the City's General Plan Circulation <br />Element. Currently, the Fairview Street bridge is utilized by bicyclists and pedestrians to cross <br />over the Santa Ana River, but there are no existing sidewalks or bikeways on the bridge. As part <br />of the proposed Project, the Fairview Street bridge would be replaced with a new six -lane bridge <br />(three lanes in each direction), including a complete bridge deck with barrier rails, sidewalks, <br />bicycle lanes, a raised median, and lighting. These features would improve the safety of the area <br />for both motorized and nonmotorized travel. <br />Vehicles using the roadway would continue to consume energy. Because the Project would add <br />lane capacity to the Fairview Street bridge, some traffic currently using other routes would use <br />the widened Fairview Street bridge, which would increase VMT in the area, which could increase <br />fuel demand. On the other hand, the improved bridge may attract additional pedestrians and <br />bicyclists due to added sidewalks and bikeways, which would allow for a decreased dependence <br />on nonrenewable energy resources. In addition, non -vehicular energy use consumed by the <br />proposed Project would be associated with minimal electricity consumption associated with <br />lighting along the Project segment. Therefore, implementation of the proposed Project would <br />not result in a long-term substantial demand for electricity and natural gas, nor would the <br />Project require new service connections or construction of new off -site service lines or <br />substations to serve the Project. The nature of proposed improvements would not require <br />substantial amounts of energy for either construction or maintenance purposes. Therefore, the <br />proposed Project would not use nonrenewable resources in a wasteful or inefficient manner. <br />Therefore, operational energy impacts would be less than significant. No mitigation is required. <br />b. Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? <br />Less Than Significant Impact. As indicated above, energy usage in the Project area during <br />construction would be temporary in nature. In addition, energy usage associated with operation of <br />the proposed Project would be relatively small in comparison to the State's available energy <br />sources, and energy impacts would be negligible at the regional level. Because California's energy <br />R:\WKE1702\ISMND\Fina1 ISMND\Fairview Street Bridge Final ISMND7,058,569 3-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.