Laserfiche WebLink
INITIAL STU DY/M ITIGATED NEGATIVE DECLARATION <br />MAY 2020 <br />FAIRVIEW BRIDGE REPLACE MENT AND STREET IMPROVEMENTS L S A <br />(9TH STREET TO 16TH STREET) PROJECT <br />SANTA ANAL CALL EORNIA <br />f. Would the project directly or indirectly destroy a unique paleontological resource or site or <br />unique geologic feature? <br />Less Than Significant with Mitigation Incorporated. A paleontological resources records search and <br />literature review were conducted to determine the paleontological sensitivity of the Project area. <br />The majority of Project excavation is anticipated to be shallower than a depth of 10 ft, with only the <br />bridge abutments possibly extending to a depth of 15 ft. Any Artificial Fill present within the Project <br />area has no paleontological sensitivity, the Very Young Wash Deposits have low paleontological <br />sensitivity, and the Young Alluvial Fan Deposits have low paleontological sensitivity from the surface <br />to a depth of 10 ft and high paleontological sensitivity below a depth of 10 ft. However, because <br />much of the Project area has been previously developed, excavation into any existing native <br />deposits for the abutments will have a limited impact area. Excavation of the proposed Project may <br />inadvertently encounter and impact paleontological resources. Therefore, if paleontological <br />resources are encountered during the course of ground disturbance, work in the immediate area of <br />the find is required to be redirected, and a paleontologist is required to assess the find for scientific <br />significance to avoid significant impacts to paleontological resources. Mitigation Measure GEO-1 <br />includes these requirements. Therefore, with implementation of Mitigation Measure GEO-1, <br />impacts to paleontological resources would be less than significant. <br />3.7.3 Mitigation Measures <br />Mitigation Measure GEO-1 Paleontological Resources Discovery. If paleontological resources <br />are encountered during the course of ground disturbance, the <br />Construction Contractor shall stop work in the immediate area of <br />the find, notify the City Public Works Director or designee, and <br />contact a qualified paleontologist to assess the find for scientific <br />significance. If determined to be significant by the qualified <br />paleontologist, the fossil shall be collected from the field. The <br />qualified paleontologist may also make recommendations regarding <br />additional measures, such as paleontological monitoring and <br />documentation. If found, scientifically significant resources shall be <br />prepared to the point of identification, identified to the lowest <br />taxonomic level possible, cataloged, and curated into the <br />permanent collections of a museum repository. If scientifically <br />significant paleontological resources are collected, a report of <br />findings shall be prepared to document the collection. <br />R:\WKE1702\ISMND\Fina1 ISMND\Fairview Street Bridge Final ISMND7,55rBB )77 3-43 <br />