My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH ADOPT RESO FOR PR NO 15-6827
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/18/2020 Adjourned Meeting
>
75B - PH ADOPT RESO FOR PR NO 15-6827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 5:42:11 PM
Creation date
8/11/2020 9:03:43 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L S A FAIRVIEW BRIDGE REPLACEMENT AND STREET IMPROVEMENTS <br />(9TN STREET TO 16TH STREET( PROJECT <br />SANTA ANAL CALIFORNIA <br />3.9 HAZARDS AND HAZARDOUS MATERIALS <br />INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />MAY 2020 <br />Less Than <br />Potentially <br />Significant <br />Impact <br />Significant with <br />Mitigation <br />Incorporated <br />Less Than <br />Significant <br />Impact <br />No <br />Impact <br />Would the project: <br />a. Create a significant hazard to the public or the environment <br />through the routine transport, use, or disposal of hazardous <br />❑ <br />® <br />❑ <br />❑ <br />materials? <br />b. Create a significant hazard to the public or the environment <br />through reasonably foreseeable upset and accident <br />El <br />El <br />® <br />El <br />involving the release of hazardous materials into <br />the environment? <br />c. Emit hazardous emissions or handle hazardous or acutely <br />hazardous materials, substances, or waste within one- <br />❑ <br />® <br />❑ <br />❑ <br />quarter mile of an existing or proposed school? <br />d. Be located on a site which is included on a list of hazardous <br />materials sites compiled pursuant to Government Code <br />El <br />El <br />ElSection <br />65962.5 and, as a result, would it create a significant <br />hazard to the public or the environment? <br />e. For a project located within an airport land use plan or, <br />where such a plan has not been adopted, within 2 miles of a <br />public airport or public use airport, would the project result <br />❑ <br />❑ <br />❑ <br />in a safety hazard or excessive noise for people residing or <br />working in the project area? <br />f. Impair implementation of or physically interfere with an <br />adopted emergency response plan or emergency evacuation <br />❑ <br />® <br />❑ <br />❑ <br />plan? <br />g. Expose people or structures, either directly or indirectly, to a <br />significant risk of loss, injury or death involving wildland <br />❑ <br />❑ <br />® <br />❑ <br />fires? <br />3.9.1 Existing Conditions <br />An Initial Site Assessment (ISA)20 was prepared for the proposed Project that reviews, evaluates, and <br />documents present and past land uses and practices, and visually examines site conditions to <br />identify Recognized Environmental Conditions (RECs). An REC is defined as the presence or likely <br />presence of any hazardous substances or petroleum hydrocarbons on a property under conditions <br />that indicate an existing release, a past release, or a material threat of a release of any hazardous <br />substances or petroleum hydrocarbons into structures or into the ground, groundwater, or surface <br />water of the subject property. Several of the following responses are based on the results of the ISA. <br />20 Group Delta. 2019. Initial Site Assessment Fairview Street Improvements from 9th Street to 16th Street <br />and Bridge Replacement Project. May 30. <br />3_48 7 5842ND\Final ISMND\Fairview Street Bridge Final ISMND.doC. (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.