My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A-2 - RESO FOR MISC FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/18/2020 Adjourned Meeting
>
75A-2 - RESO FOR MISC FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2021 3:45:14 PM
Creation date
8/11/2020 9:13:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A-2
Date
6/16/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.67% <br />ADOPTED <br />PROPOSED <br />REVENUE <br />Fy 19-20 <br />Fy 20-21 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT <br />FEES <br />FEES <br />SECTIONA <br />PUBLIC WORKS AGENCY <br />Revision within 1 year <br />01117002-56305 <br />Plans/Specificotbns Fees lnonumfuntlable) <br />Reproduction 10 Star. <br />31.19 <br />32.33 <br />Each additional <br />zm <br />2.18 <br />Mailing Minimum <br />18.32 <br />18.99 <br />08617002-56305 <br />Tract Map Final Per Hour <br />200.03 <br />2M.20 <br />0861M02-56305 <br />Parcel Map Final Perk- <br />200.03 <br />208.20 <br />08617002-56305 <br />Lot Une Atljurtment/Lot Merger Per Hour <br />200.03 <br />200.20 <br />08617002-56305 <br />Certificate of Compliance Per Hour <br />200.03 <br />200.20 <br />08617002-51704 <br />SingleFann By Residence Repair Fee for: <br />driveways, sitlewalks, curb coring Each <br />292.42 <br />300.34 <br />OSSIM02-53706 <br />Street Work Perm Rs/Inspection Fees <br />Charged in addition W other fees GCM1 <br />336.83 <br />349.19 <br />08617002-51204 <br />Inspection Fees: <br />Trench on,mation/Back Fill Unear Fcot <br />218 <br />226 <br />junks included in otherfees) Minimum <br />100 49 <br />10I.11 <br />08617002-51704 <br />Storm Drains/Culverts, Seem, Water Mains/Une Channels Unear Foot <br />10.12 <br />10.54 <br />Minimum <br />180.49 <br />187.11 <br />08617002-51203 <br />Sewer Immerals/Water Services Each <br />1,103.23 <br />1,143.72 <br />0861M02-51704 <br />Traffic Occupancy- Lane Closure Requiring Signage <br />All Streets Per Day <br />338.50 <br />350.92 <br />MinorStreets Deposit <br />1p70.25 <br />1,109.53 <br />Major Streets Deposit <br />1,424.96 <br />1p7226 <br />0861M02-51704 <br />Manhole, Vauks, Catch Oasinsand required signage, <br />stripingor barricades <br />Plus Earthwork Each <br />1,305.32 <br />1,353.23 <br />0861M02-51704 <br />Curb, Gutter or Combination including Earthwork Linear Foot <br />2.48 <br />2.57 <br />Minimum <br />180.49 <br />187.11 <br />0861M02-51704 <br />Curb Return, including Earthwork Each <br />335.54 <br />347.85 <br />0861M02-51704 <br />Sidewalk including Earthwork Sq. F.. <br />1.63 <br />1.69 <br />180.49 <br />182.11 <br />0861M02-51704 <br />Drive Approach including Farthwark Sq.Faot <br />1.11 <br />1.15 <br />Minimum <br />180.49 <br />102.11 <br />08617002-51204 <br />Pavin& including Earthwork <br />)0-2000sq.f.) Sq. F.. <br />0.46 <br />Oa <br />(Over 2000 sq. ft.) Sq. Fund <br />0.32 <br />0.33 <br />Minimum <br />180.49 <br />107.11 <br />0861M02-51704 <br />Fencing <br />Masonry, Concrete or Black Unear Four <br />1.93 <br />2.00 <br />Minimum <br />162.15 <br />10.10 <br />08617002-57006 <br />Street Trees <br />By Developeq Inspection Only Each <br />218.61 <br />226.63 <br />08617002-51204 <br />Permanent Street Patch Guarantee <br />Refundable K done in 30 calendar days Sq. Foot <br />MRS <br />42.34 <br />0861IlID2-51704 <br />Projects Exceeding$50,000&-$100,000 and/or Pomantofestimated <br />Work items not included here construction costs <br />9.59% <br />9.59% <br />0861M02-51704 <br />Projects Exceetling$100,0]O and/or Percent of estimated <br />Work items not included here construction mrts <br />7.00% <br />7.00% <br />08617002-5MC6 <br />Overtime Rate for Construction Inspectors Per Hour <br />Actual Staff Overtime <br />Actua l Staff Overtime <br />Construction Inspector overtime rate range. Actual overtime <br />Costs <br />Costs <br />hourly- rate based on Inspector's salarystep <br />0861M02-56305 <br />Certificate of Correction Per Hour <br />2M.03 <br />269.20 <br />08617002-56305 <br />Covenants,ContlRions,& Restrictions Agreements and Per Hour <br />200.83 <br />208.20 <br />Miscellaneous Chooking <br />OMIM02-53710 <br />Notice of Abatement- Standard Administration Fee Each <br />444.85 <br />461.18 <br />OM17002-53710 <br />Notice of Abatement- Multiple Postings in a 12-month Period Each <br />73.72 <br />76.43 <br />Su-yMonumentCheck: ltMonumenKheck Each <br />1,020.11 <br />1,057.55 <br />Additional monument Each <br />204.63 <br />212.14 <br />1I04 <br />Uninitiated StreetWork Permit Per Permit <br />Double StreetWork <br />Double StreetWork <br />r0161M02-11704 <br />Permit Fee <br />Permit Fee <br />2290 <br />Abandonment Processing <br />Summary Per Application <br />2,009.44 <br />2,083.19 <br />NanSummaryPer Application <br />6,028.34 <br />6,249.58 <br />75"-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.