Laserfiche WebLink
•Fulfill the 75% CIP CDBG Expenditure drawdown and MOE Expenditure drawdowns for the fiscal year by March 2021. <br />•Implement a dedicated Citywide concrete sidewalk replacement program. <br />•Conduct an assessment of all City Facilities to determine condition and required repairs. <br />•Design and construct a new CNG station at the City Yard. <br />•Award Advanced Meter Infrastructure contract and install first 1,000 smart water meters. <br />•Begin drilling of Washington Groundwater Well (first new water well in over 10 years). <br />•Complete applications for maximum requests in advance of grant deadlines for Active Transportation Program (ATP), Highway Safety Improvement Program (HSIP), and Bicycle Corridor Improvement Program (BCIP). <br />Public Works Agency <br />61