Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-6897 <br />FLOWER STREET BIKEWAY <br />FEDERAL PROJECT NO: HSIPL 5063 (187) <br />Local Assistance Procedures Manual Exhibit 16-B <br />Subcontracting Request <br />INSTRUCTIONS FOR COMPLETING SUBCONTRACTING REQUEST FORM <br />All first -tier subcontractors must be included on a subcontractor request. <br />Before subcontracting work starts, the contractor will submit an original CEM-1201 for approval according to the <br />Standard Specifications. After approval, the RE returns the original to the contractor and complete the remaining <br />distribution as listed on the bottom of the form. <br />D. If subcontractor was listed at bid time per the Fair Practices Act, check yes, otherwise check no. <br />E. If subcontractor is a certified DBE contractor, check yes, otherwise check no. <br />F and G. When a portion of an item is subcontracted, describe the portion and show the percentage of the bid item <br />and value. <br />G. When an entire item is subcontracted, show the full bid item value. <br />THIS FORM IS NOT TO BE USED FOR SUBSTITUTIONS OF SUBCONTRACTORS AND UDBE, DVBF. OR <br />SMALL. BUSINESS ENTITIES. <br />Paget oft January 2018 <br />L of-% v4 <br />