Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />PROJECT 17-6879: FLOWER STREET BIKEWAY HSIPL-5063(187) <br />Construction Contract $711,682 <br />Contract Administration $80,560 <br />Inspection and Testing $20,140 <br />Contingencies $53,205 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$865,587 <br />23A-75 <br />