My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
23A - BUDGET REALLOCATION FOR FLOWER BIKEWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:01:40 PM
Creation date
8/13/2020 4:36:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
8/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA 40 <br />PROPOSAL <br />PROJECT NO.: 17-6897 <br />F1,OVA' R STREET BTKEWAY <br />FEDERAL PROJECTNO: HSIPL 5063 (187) <br />Item <br />Description <br />t <br />Unit <br />Unit Price <br />Amount <br />14 <br />IP Communication System at McFadden <br />Ave & Flower St <br />I <br />LS <br />$ f(�CC` <br />\ <br />$ �C <br />15 <br />Construct ADA Curb Ramp Per Plan <br />300 <br />SF <br />$ I 1 `Z <br />"' l <br />$ <br />1 <br />16 <br />Pothole For Utility Not Shown on Plan <br />10 <br />EA <br />$ ll <br />i <br />17 <br />Pothole For Utility for Traffic Signal <br />8 <br />EA <br />$,�-�j <br />$ .�./(✓OG� <br />Pole Locations <br />Unclassified Excavation <br />10 <br />CY <br />$ <br />$ <br />19 <br />Temporary Overhead Wiring at Edinger <br />1 <br />LS <br />$1 ���'�� <br />$�-I [�,CG <br />Ave & Flower St <br />20 <br />Temporary Overhead Wiring at <br />1 <br />LS <br />$ 7- 5r, <br />$ S c�cl O <br />McFadden Ave & Flower St <br />21 <br />Install Type "Q" Bike Loop <br />13 <br />EA <br />$ <br />$ <br />22 <br />Install Type "E" & Type "D" Bike Loop <br />120 <br />EA <br />$ <br />$ <br />23 <br />Signing and Striping <br />I <br />LS <br />$ <br />11e3151 <br />$ <br />24 <br />Labor Agreement Oversight <br />1 <br />LS <br />$10,000 <br />$10,000 <br />TOTAL BASF. B[ w " 7 (' Lo"bl <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves <br />the right to award the Base Bid, and any, al I, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />i yX--S6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.