My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT FIR 5 YR STORAGE TANK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
25G - AGMT FIR 5 YR STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 4:56:50 PM
Creation date
8/13/2020 4:37:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
8/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
site <br />2b. <br />Annual Vapor Recovery Testing <br />1. Cost per test <br />$1.580.00 <br />2. Cost per re -test <br />$1.355.00 <br />TRIENNIAL TEST (REQUIRED EVERY THREE YEARS): <br />3. <br />Secondary Containment Testing <br />1. Cost per test <br />$ 3.670.00 <br />2. Cost per re -test <br />$ 3 370 00 <br />*Re -test cost sections are listed in case the re -test is performed on a different day. <br />4. <br />Facility Employee Training as per <br />regulations and UST program <br />requirements <br />Cost per <br />Training <br />$-3� $220 00 <br />5 <br />In person attendance at UST Task <br />Force meetings as per UST program <br />requirements. Meetings are normally <br />one hour. Invoice shall be for actual <br />meeting time. Cost shall include travel <br />time to reach location. <br />Cost per <br />Meeting <br />Hour <br />$210.00 <br />LABOR RATE <br />6a. <br />Same Business Day Service Calls (service calls made by 1:00 p.m. PST). <br />The Contractor shall quote labor rates and provide explanation as required <br />herein: <br />1. Straight Time On -Site Time ($Prevailinci/Houl <br />$ 150.00 per hour <br />2. Over Time On -Site Over Time Prevailing/Hour <br />$ 175.00 per hour <br />3. Double Time: On -Site Double Time $Prevailin /Hour <br />$ 200.00 per hour <br />6b. <br />Next Business Day Service Calls (Service calls made after 1:00p.m. PST). <br />The Contractor shall quote labor rates and provide explanation as required <br />herein: <br />1. Straight Time On -Site Time ($Prevailing/Hour)) <br />$ 150.00 per hour <br />2. Over Time On -Site Over Time ($Prevailing/Hour)) <br />$ 175.00 per hour <br />3. Double Time: On -Site Double Time ($Prevailing/Hour)) <br />$ 200.00 per hour <br />4. Travel(Non-Prevailing Wage Drive Time <br />$100.00 per hour <br />Contractor shall define what constitutes Straight Time, Over Time and Double Time: HoudyRatesare based upon Tot <br />QGA <br />Straight Time: (please specify if a minimum time is billed for each call.)There land minimumtimerequirement . <br />Over Time: (please specify when overtime is paid.) overtime is paid in excass of 8 hours (based upon any and all total hours earned forth <br />Double Time: (please specify when double time is paid. For holidays, indicate which holidays.) DoubleT;,e <br />7 <br />Emergency Service Calls (Response by phone required within 30 minutes <br />and onsite response required within 2 hours of service call). <br />No more than two 2 Service Technicians shall be allowed per service call <br />City of Santa Ana — RFP 20-064 <br />Fuel Site Designated Operator, Maintenance and Repair Services <br />19 <br />Is <br />Iincurred <br />day). Overtime Is also <br />paid In excess of <br />d upon any & all total <br />hours earned forthe <br />day), or on work <br />performed on Sunday's. <br />Double Time Is applicable <br />on National & Federally <br />Recognized <br />Holidays. <br />25G-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.