Laserfiche WebLink
�jjTAIT <br />.01n . ro rnt cnaurn0 <br />p:714/560/8222 w Aait.com <br />Tait Environmental Services, Inc. <br />Schedule of Rates <br />702 N. Paritcenter Drive, Santa Ana, CA 92705 <br />Field Personnel <br />Classification <br />Hourly Rate <br />Service Technician — Regular (Drive or Office Time) <br />512, 505, 041, <br />511,035 <br />$ 100.00 <br />Service Technician — Prevailing Wage <br />512, 505, 041, <br />511,035 <br />$ 150.00 <br />Administrative Personnel <br />Senior Project Manager <br />090 <br />$ 140.00 <br />Project Manager <br />091 <br />$ 130.00 <br />Assistant Project Manager <br />125 <br />$ 110.00 <br />Database Manager <br />503 <br />$ 105.00 <br />Health & Safety Manager <br />510 <br />$ 100.00 <br />Project Coordinator <br />507 <br />$ 90.00 <br />Administrative Assistant <br />039 <br />$ 65.00 <br />Professional Personnel <br />Principal <br />001 <br />$ 225.00 <br />Senior Engineer/Geologist <br />020 <br />$ 150.00 <br />Senior Designer & Design Group Manager <br />141 <br />$ 145.00 <br />Designer <br />004 <br />$ 105.00 <br />Project Engineer/Geologist <br />092 <br />$ 110.00 <br />Environmental Scientist <br />104 <br />$ 100.00 <br />Researcher / Permit Expediter <br />040 <br />$ 90.00 <br />Environmental Technician <br />121 <br />$ 70.00 <br />• The Above Labor Rates are Based on an 8-Hour Day. <br />• Time in Excess of 8 Hours will be Charged at the specified Over Time Rate. <br />• Labor for Saturday Work will be Charged at the specified Over Time Rate. <br />• Labor Rates for Sunday and Holiday (Nationally and Federally Recognized <br />Holidays) will be Charged at at the specified Double Time Rate. <br />• Prevailing Wage rates do apply to "Field Personnel', however would be directed <br />by the scope of work. <br />PAGE 1 OF 2 <br />25G-24 <br />