My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH AMEDNING CH 41 HOO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75B - PH AMEDNING CH 41 HOO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:07:38 PM
Creation date
8/13/2020 4:49:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
8/18/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
containing those provisions necessary to ensure that the requirements of this <br />article are satisfied, whether through the provision of inclusionary units or <br />through an approved alternative method. <br />(b) Discretionary approvals. No discretionary approval shall be issued for a residential <br />project subject to this article until the developer has submitted an inclusionary <br />housing plan. <br />(c) Issuance of building permit. No building permit shall be issued for a residential <br />project subject to this article unless the executive director has approved the <br />inclusionary housing plan, and any required inclusionary housing agreement has <br />been recorded. <br />(d) Issuance of certificate of occupancy. A certificate of occupancy shall not be issued <br />for a residential project subject to this article unless the approved inclusionary <br />housing plan has been fully implemented. <br />E,Y� �QiE'I�Z:1Q.�iTiLMOR <br />(a) Location within project, relationship to non-inclusionary units. All inclusionary units <br />shall be: <br />(1) Reasonably dispersed throughout the residential project; <br />(2) Proportional, in number of bedrooms, gross floor area of habitable space, and <br />location, to the market rate units; <br />(3) Comparable to the market rate units included in the residential project in terms <br />of design, materials, finished quality, and appearance; and <br />(4) Permitted the same access to project amenities and recreational facilities, as <br />are market rate units. <br />(b) Timing of construction. All inclusionary units in a residential project shall be <br />constructed concurrent with, or before the construction of the market rate units. If <br />the city approves a phased project, a proportional share of the required inclusionary <br />units shall be provided within each phase of the residential project. <br />(c) Location outside the proposed original project. For projects where the developer <br />proposes to either produce new inclusionary units or rehabilitate existing off -site <br />units to meet the inclusionary affordable housing requirements of this ordinance, the <br />off -site project(s) containing the required inclusionary units shall be subject to the <br />following requirements: <br />(1) The sum -total area (in habitable square feet) of all the newly constructed off - <br />site inclusionary units shall be the same number of habitable square feet of <br />inclusionary area as required by this ordinance. For the purpose of the <br />calculation of the number of square feet of required inclusionary housing, the <br />total gross habitable square feet of the housing units of the original market rate <br />project shall be used, as measured from exterior walls to exterior walls of the <br />market units provided as the base for calculation either ten (10) percent for very <br />75B-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.