My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S�aeA �C Technical Consultation, Data Analrein and <br />7*A G Litigation support for the Ennironci <br />26Sfi 29" Street, Suite 201 <br />Santa Monica, CA 90405 <br />Matt Hagemann, P.G, CA& <br />(949) 987-9013 <br />mha¢emannaswaoe.com <br />Papl E. Rosenfeld, PhD <br />(310) 795-2335 <br />prr, a feldrrr2swape.mm <br />May 11, 2020 <br />Mitchell M. Tsai <br />155 South El Molina Avenue <br />Suite 104 <br />Pasadena, CA 91101 <br />Subject: Commetns on the Bowery Mixed -Use Project (SCH No. 20190901 <br />Dea r Mr. Tsai, <br />We have reviewed the January 2020 Draft Environmental Impact Report ("DEIR") for the Bowery Mixed - <br />Use Project ("Project") located in the City of Santa Ana ("City"). The Project proposes to demolish three <br />existing buildings totaling 212,121-square feet in order to construct 1,150 multi -family residential units <br />and 90,000-square feet ofcomrnercial retail/restaurant space, including an 18,00o-square foot retail <br />shopping center, 5,000-square foot fast casual restaurant, 25,000-square foot qua lity restaurant, <br />25,000-square foot high turnover sit down restaurant, 5,0004square foot fast food restaurant, and <br />2,000-square foot coffee/donut shop. The Project also proposes to construct 183,3G3-square feet of <br />open space and recreation amenities and 2,355 parking spaces on the 14,58-acre site. <br />Our review concludes that the Ei fads to adequately evaluate the Project's Air Quality, Health Risk, <br />and Greenhouse Gas impacts. As a result, emissions and health risk impacts associated with construction <br />and operation of the proposed Project are underestimated and inadequately addressed. An updated FIR <br />should be prepared to adequately assess and mitigate the potential air quality and health risk impacts <br />that the project may have on the surrounding environment. <br />Air Quality <br />Unsubstantiated Input Parameters Used to Estimate Projcc;t Emissio Lis <br />The DFIR's air quality analysis relies on emissions calculated with CaIEEMod2O16.3.2.f Ca IEEMod <br />provides recommended default values based on site -specific information, such as land use type, <br />LAPfri& (Nrne i 2017) CaIFEMpu Ilsrr't guide, httn /lwww anmd envldrx�/darault- <br />source/caleenrod/01 user-39-s-nuide2016-3-2 LSnov rnaer2017.ndVsivrsni <br />28 <br />75C-170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.