My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Bowery Mixed -Use Project <br />CEQA Comment <br />May 11, 2020 <br />Page 20 <br />above. The FEIR needs to plan for protection of construction workers who may encounter <br />contaminated groundwater when excavation is conducted" SWAPF., p_ 4_ <br />IV. CONCLUSION <br />18 <br />For the foregoing reasons, SAFER requests the Planning Commission decline to <br />recommend approval of the Project and certification of the FEIR, and instead require preparation <br />of a revised EIR that conforms with CEQA, as described above. <br />Sincerely, <br />Rebecca L. Davis <br />75C-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.