My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75C
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
CORRESPONDENCE - 75C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2020 3:38:45 PM
Creation date
8/14/2020 11:38:39 AM
Metadata
Fields
Template:
City Clerk
Date
8/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Bowery Mixed -Use Project 2. Response to Comments <br />without construction of a right -turn lane. However, the mix of retail and restaurant types of uses included in <br />the Project has been modified, as shown below and listed in Chapter 3, Revisions to the Draft EIR, The <br />proposed 80,000 square feet of commercial space would consist of the following uses: <br />• Retail Shopping Center: 18,000 31.000 square feet <br />• Fast Casual Restaurant: 3,000 3,500 square feet <br />• Quality Restaurant: 25,000 20,000 square feet <br />• High -Turnover Sit -Down Restaurant: 25,000 20,000 square feet <br />• Fast Food Restaurant: -5,GW 3,500 square feet <br />• Coffee/Donut Shop: 2,000 square feet <br />The resulting trip generation of the Project would be lower; and as detailed in the Final TIA, included as <br />Appendix A of this Final EIR. Due to the lower trip generation, the Project would no longer result in significant <br />impact at the intersection of Red Hill Avenue/Warner Avenue in the 2040 PM Peak Hour condition, and <br />mitigation measures are not required. <br />Comment 14: This comment refers to Tustin Ranch Road and Warner Avenue North and states that for City <br />of Tustin locations where the intersection capacity utilization (ICU) is greater than the acceptable level of <br />service (i.e., LOS E or ICU is greater than 0.90), mitigation of the project contribution is required to bring the <br />intersection back to no -project conditions or better if the project contribution is greater than 0.02 or <br />greater at non -Congestion Management Program (CMP) locations. Therefore, this intersection is not <br />considered adversely impacted by the proposed Project. The comment states that Draft EIR indicates that <br />the intersection is adversely impacted and should be revised. <br />Response 14: The methodology section in the TIA has been modified to accurately reflect the thresholds. <br />The impact and mitigation measure for Intersection 47, Tustin Ranch Road and Warner Avenue North, were <br />removed. The Final TIA is included as Appendix A of this Final EIR. <br />Comment 15: This comment refers to the proposed a new signal at Driveway 1 /Warner Avenue intersection, <br />and states that due to its proximity to the Red Hill Avenue and Warner Avenue signalized intersection <br />maintained by the City of Tustin it is expected that the proposed new signal at Driveway 1 /Warner Avenue <br />be also maintained by the City of Tustin. The comment also states that the Project shall be required to <br />collaborate with the City of Tustin in its design and construction. <br />Response 15: Language was added to the Final TIA to indicate that the design and construction of the signal <br />will be coordinated with the City of Tustin. The Final TIA is included as Appendix A of this Final EIR. <br />Comment 16: This comment refers to a Class II Bicycle Facility on Warner Avenue and states that the <br />proposed Project shall be required to collaborate on the proposed joint Santa Ana/Tustin project to add a <br />Class II Bike Lane on Warner Avenue on the northern boundary of the Project, with the City of Santa Ana as <br />the lead. <br />Response 16: Language was added in Table 4. Study Area Roadway Characteristics to indicate planned <br />Class II Bike Lanes along Warner Avenue. According to the City of Santa Ana, the Project would maintain <br />the existing southern curb lines on Warner Avenue. The Bowery Project's street improvements will coordinate <br />with the bike lane project to ensure that the bikeway project is not precluded. The Final TIA Is included as <br />Appendix A of this Final EIR. <br />Comment 17: This comment states that the through Traffic volumes on Warner Avenue west of Red Hill Avenue <br />decrease significantly to/from the Red Hill Avenue and Warner Avenue intersection, which may <br />underestimate the Project impact at the proposed signalized Project driveway on Warner Avenue. The <br />comment requests an explanation of the decreased through traffic volumes. <br />City of Santa Ana 2-61 <br />Final EIR <br />April 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.