My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRAFFITI PROTECTIVE COATINGS, INC
Clerk
>
Contracts / Agreements
>
G
>
GRAFFITI PROTECTIVE COATINGS, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:28:12 AM
Creation date
8/18/2020 8:42:42 AM
Metadata
Fields
Template:
Contracts
Company Name
GRAFFITI PROTECTIVE COATINGS, INC
Contract #
A-2020-155
Agency
PUBLIC WORKS
Council Approval Date
7/21/2020
Expiration Date
10/31/2023
Insurance Exp Date
1/1/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Purchasing Division <br />20 Civic Center Plaza <br />-- Santa Ana, CA 9270, <br />Abate the entire surface in the event that the graffiti covers a significant area of the <br />surface. The Project Manager or his/her designee shall determine whether or not an <br />entire surface will be abated on a case by case basis. <br />h. Ensure protection of the work area at all times, including, but not limitedto: <br />i. Barricade the area of work at safe distances, so as to prevent unauthorized <br />access to the area; <br />ii. Barricade area of work within the public right-of-way; <br />iii. Using warning signs and safety cones to inform the public of work being <br />conducted; <br />iv. Immediately correct damage to the work site; <br />v. Leave work site in undamaged condition; <br />vi. Post signage to identify wet paint; <br />vii. Remove all equipment and materials when leaving work each day. <br />viii. Dispose of all packaging, containers and excess materials in accordance with <br />applicable laws, regulations, ordinances, codes, and any other legislative or <br />statutory requirements. Materials rinse residue shall be collected and disposed <br />of appropriately. <br />Meet with City Project Manager and/or his/her designee when requested at mutually <br />agreed upon dates and times. <br />Contain and dispose of all sand, water, or other materials used in blasting or pressure <br />washing operations in accordance with local, State, and Federal regulations. <br />k. Correct any damage to public or private property as a result of Contractor's operations <br />at the sole expense of the Contractor. <br />I. Apply anti -graffiti coatings, as required, by the Project Manager and/or his/her <br />designee. <br />m. Conduct operations with least possible obstruction and inconvenience to the public, <br />and barricade no qreater area of work than necessary. <br />Provide and maintain fences, barriers, directional signs, lights, and flag persons as <br />necessary to give adequate warning to the public at all times of any dangerous <br />conditions to be encountered as a result of the work and to give directions to the public. <br />Any road break permits required shall be the responsibility of the Contractor. <br />o. Conduct full-time daily proactive surveillance at Contractor's expense. <br />Working hours shall be no earlier than 6:00 a.m. and no later than 5:00 p.m. On <br />weekends and holidays, the Contractor shall respond to all GO Santa Ana mobile <br />phone application and graffiti telephone hotline requests received by 12:OOnoon. <br />Removal Services Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.