My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-065 - Adopting Environmental Findings of Fact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-065 - Adopting Environmental Findings of Fact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 3:04:10 PM
Creation date
8/20/2020 3:02:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-065
Date
8/20/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Warner Redhill Mixed -Use Project CEQA Findings of Fact <br />SECTION VI <br />RESOLUTION REGARDING GROWTH -INDUCING IMPACTS AND COMMITMENT OF <br />RESOURCES <br />Section 15126.2(d) of the State CEQA Guidelines requires the EIR to address the growth -inducing <br />impact of the Project. EIR Section 5.17 evaluates the potential for the proposed Project to affect <br />economic or population growth, or the construction of additional housing, either directly or <br />indirectly, in the surrounding environment. <br />Employment Related Growth <br />The Project site has been used Ricoh Electronics Inc. for light industrial uses that provide <br />employment since its development in 1979 and 1981. The site was vacated by Ricoh in 2018 and <br />the buildings are partially re -occupied and used for storage, electronics recycling, and as <br />temporary housing for the homeless. <br />The proposed Project would redevelop the Project site to provide 1,150 multi -family residential <br />units and 80,000 square feet of commercial retail space. As detailed in Section 5.11, Population <br />and Housing, this is anticipated to generate approximately 320 employees at full occupancy, <br />which would be 0.27 percent of the existing jobs within 2-miles of the Project site; and therefore, <br />would not result in induced unplanned employment growth. <br />Infrastructure Obstacles to Growth <br />The proposed Project would redevelop the existing onsite infrastructure systems and provide an <br />off -site sewer line improvement that would connect to the existing off -site systems that currently <br />serve the Project site. The new infrastructure would not provide additional capacity beyond what <br />is needed to serve the proposed Project. In addition, because the Project is within a developed <br />area that is receiving services from existing infrastructure and would connect to the existing <br />infrastructure, development of the proposed Project would not result in an expansion of overall <br />capacity, extension of infrastructure, or provision of services in areas or an unserved area. <br />Therefore, infrastructure improvements would not result in significant growth inducing impacts. <br />Land Development Regulation Obstacles to Growth <br />The proposed Project includes amendments to the General Plan and to the zoning code to allow <br />for the redevelopment of the site to provide the proposed mixed -use development as opposed to <br />the existing light industrial building uses. The Project proposes a General Plan land use <br />designation amendment from PAO (Professional and Administrative Office) to District Center, <br />which would allow specific development requirements for the proposed mixed uses. In addition, <br />the Project includes a proposed zoning change from M-1 (Light Industrial) to a Specific <br />Development designation, which would also provide specific development regulations for the <br />mixed -use Project. <br />The proposed Project is redevelopment of an already developed area that has been used for <br />urban uses since 1979 and is surrounded by urban development or areas planned for urban <br />development. The proposed Project would involve a change to development regulations and <br />would result in onsite residents and additional onsite employees. However, the zoning and land <br />use changes are parcel specific and would not result in growth outside of the Project site, because <br />the areas are either completely developed or within development land use plans. Changes to the <br />Project site's land use and zoning designations would not result in removing an obstacle to growth <br />within the Project vicinity. <br />City of Santa Ana 55 <br />May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.