My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-065 - Adopting Environmental Findings of Fact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-065 - Adopting Environmental Findings of Fact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 3:04:10 PM
Creation date
8/20/2020 3:02:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-065
Date
8/20/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Warner Redhill Mixed -Use Project CEQA Findings of Fact <br />• No Project/No Build Alternative <br />• Reduced Project Alternative <br />• Build Out of the Existing Land Use and Zoning Alternative <br />Alternatives Not Selected for Analysis <br />Alternative Site: An alternative site was considered and eliminated from further consideration. <br />CEQA specifies that the key question regarding alternative site consideration is "whether any of <br />the significant effects of the Project would be avoided or substantially lessened by putting the <br />Project at another location." In addition, an alternative site need not be considered when <br />implementation is "remote and speculative," such as when the alternative site is beyond the control <br />of a Project proponent. <br />The Project Applicant is the owner of the Project site, and the Project site building is underutilized <br />in the existing condition. The Project objectives are to redevelop an existing underutilized parcel <br />and implement new multi -family housing near employment, provide development consistent with <br />other regional redevelopment in the Tustin Legacy Specific Plan and IBC and utilize existing <br />infrastructure, all of which are consistent with the opportunities provided by the Project site. In <br />addition, due to the urban and built out nature of the City, development of 1,150 multi -family <br />residential units and 80,000 square feet of commercial uses on another 14.58-acre site at a <br />different location would likely require demolition of existing structures, require similar mitigation, <br />and have similar impacts as the proposed Project. CEQA specifies that the key question regarding <br />alternative site consideration is "whether any of the significant effects of the project would be <br />avoided or substantially lessened by putting the project at another location." Given the size and <br />nature of the proposed Project and the Project objectives, it would be infeasible to develop and <br />operate the Project on an alternative site with fewer environmental impacts. Therefore, the <br />Alternative Site Alternative was rejected from further consideration. <br />Description of Alternatives <br />Alternative 1: No Project/No Build Alternative <br />Pursuant to Section 15126.6(e)(2) of the CEQA Guidelines, the EIR is required to "discuss the <br />existing conditions at the time the notice of preparation is published, or if no notice of preparation <br />is published, at the time the environmental analysis is commenced, as well as what would be <br />reasonably expected to occur in the foreseeable future if the project were not approved, based <br />on current plans and consistent with available infrastructure and community services." <br />Therefore, under this alternative, no development would occur on the Project site and it would <br />remain in its existing condition with three existing buildings with a total 212,121 square feet. The <br />Project site is located within a completely developed and highly used urban area, near freeways <br />and transit, and contains three existing useable structures. Therefore, it is not reasonable to <br />assume that the Project site would remain underutilized in the long-term. Thus, in the No <br />Project/No Build condition it is reasonably expected that all of the 212,121 square feet of <br />industrial building space would be re -occupied. Hence, this alternative compares impacts of the <br />proposed Project with re -occupation at full capacity of the three existing industrial buildings <br />Alternative 2 — Reduced Project Alternative <br />Under this alternative, a reduction in the number of residential units and commercial square <br />footage would be built, which would result in increased setbacks and reduced building heights. <br />May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.