My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RECIEVE AND FILE PWA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
19C - RECIEVE AND FILE PWA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 1:20:44 PM
Creation date
8/27/2020 4:37:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19C
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />The City of Santa Ana (City) Public Works Agency utilizes StreetSaver and geographical <br />information system (GIS) to develop the Pavement Management Program (PMP) to provide an <br />accurate inventory of the past, current and projected pavement condition of all public roadways <br />and alleys and to implement the roadway and alley maintenance and rehabilitation (M&R) <br />program to maximize the return from available existing funding for street and alley pavement. <br />The City currently manages 27.4 centerline miles of alleys for a total of approximately 2.5 million <br />square feet (SF) of paved surfaces. To assist planning maintenance needs, the alleys are also <br />arranged into over 350 sections and classified by surface types — Asphalt Concrete (AC) or <br />Portland Cement Concrete (PCC). Pavement condition inspections for the alleys database are <br />performed every four to six years and the alley network inspection was performed in 2018. <br />Table 1, Figures 1 and 2 show the summary and backlog for the entire alley database. <br />Table 1: Alley Database Summary (Based on 2018 Inspection) <br />Pavement <br />Quality <br />PCI <br />PCC <br />AC <br />Backlog <br />Centerline <br />(mile) <br />Area (SF) <br />Centerline <br />(mile) <br />Area (SF) <br />Very Good <br />86-100 <br />4.9 <br />426,568 <br />0.3 <br />23,980 <br />$ - <br />Good <br />75-85 <br />2.4 <br />230,145 <br />0.3 <br />28,372 <br />$ 590,000 <br />Fair <br />60-74 <br />3.0 <br />297,880 <br />0.8 <br />73,636 <br />$ 1,300,000 <br />Poor <br />41-59 <br />0.6 <br />64,560 <br />1.3 <br />118,592 <br />$ 1,100,000 <br />Very Poor <br />0-40 <br />0.0 <br />0 <br />13.7 <br />1,199,949 <br />$ 22,700,000 <br />TOTAL <br />10.9 <br />1,019,153 <br />16.5 <br />1,444,529 <br />$ 25,690,000 <br />FIGURE 1 ALLEY DATABASE: PCI & CENTERLINE (mile) <br />■ Very Poor 0-40 Poor 41-59 Fair 60-74 Good 75-85 ■ Very Good 86-100 <br />City of Santa Ana 2020 PMP (Alleys) 1916-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.