Laserfiche WebLink
PROPOSAL <br />Organizational Chart <br />+_ � A © Rob O'Neil, PE <br />If -, <br />Staff Availability <br />Electrical Lighting Design Services for Civic Center Perimeter Lighting <br />RFP No.20-026 <br />®= Key Personnel IIIII'. <br />Michael Reed <br />Said Hilmy, PhD, SE, LEED AP <br />The following is an estimate of the availability of our key personnel during the duration of this project. The <br />percentages of key staff availability shown are projected based on anticipated workload. These <br />percentages represent the average time available for a team member. Actual time may vary depending <br />on the project specifics. <br />Personnel Availability Personnel Availability <br />Said Hilmy, PhD, SE, LEED AP 15% Ramin Arabpour 60% <br />Rob O'Neil <br />30% <br />Michael Reed <br />50% <br />Hassan Assaf, PE, RCDD <br />40% <br />Bob Kramer <br />50% <br />Jaime Rosenbach, MS, SE <br />40% <br />Peter Gambino, PE, PLS <br />35% <br />Faisal Dakhil, BSCE, MSCE <br />40% <br />�� I DS GROUP Page 4 <br />25C-24 <br />