My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - CIVIC CENTER LIGHTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
25C - CIVIC CENTER LIGHTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 1:23:11 PM
Creation date
8/27/2020 4:37:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Electrical Lighting Design Services for Civic Center Perimeter Li hting <br />RFP No.20-026 <br />Y <br />;t <br />3t <br />1 1 <br />4 <br />\ <br />U <br />6 <br />- . <br />�I <br />l AR£EI'lL'CPIXAY <br />I i1 <br />Landside lighting improvements included 120 new LED light poles and light fixtures for entire perimeter <br />roadway system for arrival and departure pedestrian entrances and exits; new light poles and light fixture <br />for taxi and shuttle service areas; disconnect and remove existing So California Edison meter pedestal; <br />new conduit, conductors, circuit, and lighting controls for roadway lighting; structural anchoring and <br />foundations for all new light poles. <br />CITY OF SANTA ANA, ELECTRICAL LIGHTING DESIGN FOR 3 PARKS I Santa Ana, CA <br />IDS provided engineering design services for plans, specifications and cost <br />estimating (PS&E) for the new electrical and security lighting systems Pacific <br />Electric Bike Trail, Saddleback View Park, and Morrison Park. <br />IDS conducted site visits, utility location and coordination with Southern California <br />Edison. Construction documents were submitted at 85% and 100% along with <br />updated cost estimates which reflected finalized plans, materials, systems, details <br />of construction, and any known or anticipated changes to the project. <br />IDS provided construction administration support which included responses to <br />Request for Information, periodic field reviews, and drawings for corrections and <br />change orders. Upon completion of construction, IDS prepared the "as -built' <br />plans incorporating all changes to the plans electronically with all necessary <br />revision notations. <br />Project Relevance <br />0 Lighting design <br />0 Perimeter lighting <br />0 Electrical Engineering <br />0 Civil Engineering <br />0 Structural Engineering <br />0 Cost Estimation <br />Client Contact: <br />Mr. Kenny Nguyen, Sr. Civil <br />Engineer <br />City of Santa Ana <br />714.647.5632 <br />kneuven cDsanta-ana.ore <br />Dates of Performance: <br />1/2019 — 9/2019 <br />AALI DS GROUP 25C-30 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.