My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BEWLEY STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
75A - PH BEWLEY STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 4:06:43 PM
Creation date
8/27/2020 4:37:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions of Approval for Tentative Tract May No. 2020-01 <br />Tentative Tract Map No. 2020-01 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the California Building Standards Code, the <br />California Subdivision Map Act, and all other applicable regulations. In addition, the <br />following conditions of approval are applicable: <br />The Applicant must comply with each and every condition listed below Prior to exercising <br />the rights conferred by this tentative tract map. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the tentative tract map. <br />All proposed site improvements must conform to the Development Project plan <br />approved per DP No. 2017-35. <br />2. Any amendment to this tentative tract map, including modifications to approved <br />materials, finishes, architecture, site plan, landscaping, parking, and square <br />footages, must be submitted to the Planning Division for review. At that time, staff <br />will determine if administrative relief is available or if the site plan review must be <br />amended. <br />3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to <br />be submitted for review and approval by the Planning Division. The landscape <br />plan shall conform to the R-2 landscape standards, Citywide Design Guidelines, <br />and the City's Water Efficient Landscape Ordinance. In addition, vines shall be <br />planted along perimeter walls and be spaced every 10 feet. <br />4. Applicant must submit Covenants, Conditions, and Restrictions (CC&Rs) for the <br />project to the Planning Division for review and approval prior to the Final Map <br />being recorded. <br />5. The Final Map must be approved and recorded prior to issuance of Building <br />permits. <br />6. The Final Map and all improvements required to be made or installed by the <br />subdivider must be in accordance with the design standards and specifications of <br />the Santa Ana Municipal Code and the requirements of the State Subdivision <br />Map Act. <br />Resolution No. 2020-xx <br />75A-27 Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.