My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BEWLEY STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/01/2020
>
75A - PH BEWLEY STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 4:06:43 PM
Creation date
8/27/2020 4:37:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A BEWLEY STREET TOWNHOMES PROJECT <br />Final Initial Study/Mitigated Negative Declaration <br />4.0 MITIGATION MONITORING <br />AND REPORTING PROGRAM <br />The California Environmental Quality Act (CEQA) requires that when a public agency completes an <br />environmental document which includes measures to mitigate or avoid significant environmental effects, <br />the public agency must adopt a reporting or monitoring plan. This requirement ensures that environmental <br />impacts found to be significant will be mitigated. The reporting or monitoring plan must be designed to <br />ensure compliance during project implementation (Public Resources Code Section 21081.6). <br />In compliance with Public Resources Code Section 21081.6, Table 1, Mitigation Monitoring and Reporting <br />Checklist, has been prepared for the Bewley Street Townhomes Project (project). This Mitigation <br />Monitoring and Reporting Checklist is intended to provide verification that all applicable mitigation <br />measures relative to significant environmental impacts are monitored and reported. Monitoring will include: <br />1) verification that each mitigation measure has been implemented; 2) recordation of the actions taken to <br />implement each mitigation; and 3) retention of records in the City of Santa Ana Bewley Street Townhomes <br />Project file. <br />This Mitigation Monitoring and Reporting Program (MMRP) delineates responsibilities for monitoring the <br />project, but also allows the City flexibility and discretion in determining how best to monitor implementation. <br />Monitoring procedures will vary according to the type of mitigation measure. Adequate monitoring consists <br />of demonstrating that monitoring procedures took place and that mitigation measures were implemented. <br />This includes the review of all monitoring reports, enforcement actions, and document disposition, unless <br />otherwise noted in the Mitigation Monitoring and Reporting Checklist (Table 1). If an adopted mitigation <br />measure is not being properly implemented, the designated monitoring personnel shall require corrective <br />actions to ensure adequate implementation. <br />Reporting consists of establishing a record that a mitigation measure is being implemented, and generally <br />involves the following steps: <br />The City distributes reporting forms to the appropriate entities for verification of compliance. <br />Departments/agencies with reporting responsibilities will review the IS/MND, which provides <br />general background information on the reasons for including specified mitigation measures. <br />Problems or exceptions to compliance will be addressed to the City as appropriate. <br />Periodic meetings may be held during project implementation to report on compliance of mitigation <br />measures. <br />Responsible parties provide the City with verification that monitoring has been conducted and <br />ensure, as applicable, that mitigation measures have been implemented. Monitoring compliance <br />may be documented through existing review and approval programs such as field inspection <br />reports and plan review. <br />The City prepares a reporting form periodically during the construction phase and an annual report <br />summarizing all project mitigation monitoring efforts. <br />June 2020 4.1 Mitigation Monitoring and Reporting Program <br />75A-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.