Laserfiche WebLink
Rate Schedule <br />Subsurface Utility Engineering <br />Services <br />Pothole Under Natural Ground <br />(SUE) <br />Bill Rate <br />$600.00 <br />Services and <br />Overtime <br />$685.00 <br />Hourly <br />Prevailing <br />Wage <br />$685.00 <br />Rates <br />Prevailing <br />Wage . <br />$1,025.00 <br />Unit <br />per hole <br />Pothole Under Paving/Concrete <br />$700.00 <br />$805.00 <br />$855.00 <br />$1,365.00 <br />per hole <br />Pothole Exceeding 6.99 feet in Depth <br />$105.00 <br />$125.00 <br />$130.00 <br />$165.00 <br />per foot <br />Air -Vacuum Excavation Truck/Crew/Equipment <br />$335.00 <br />$395.00 <br />$425.00 <br />$510.00 <br />per hour <br />Utility Designating/Investigation Underground <br />$0.91 <br />$1.14 <br />$1.15 <br />$1.48 <br />perfoot <br />Utility Designating/Investigation Overhead <br />$0.45 <br />$0.58 <br />$0.581 <br />$0.74 <br />per foot <br />Utility Designating: 2-Man Crew/Equipment <br />$275.00 <br />$350.00 <br />$335.00 <br />$440.00 <br />per hour <br />Utility Designating 1-:Man Crew/Equipment <br />$195.00 <br />$220.00 <br />$210.00 <br />$260.00 <br />per hour <br />Concrete/Asphalt Coring <br />$165.00 <br />$205.00 <br />$205.00 <br />$225.00 <br />per hour <br />Survey: 2-Man Crew/Equipment <br />$255.00 <br />$345.00 <br />$260.00 <br />$350.00 <br />per hour <br />Survey: 1-Man Crew/Equipment <br />$180.00 <br />$225.00 <br />$185.00 <br />$230.00 <br />per hour <br />Senior Project Manager <br />$205.00 <br />N/A <br />N/A <br />N/A <br />1perhour <br />Project Engineer <br />$185.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />Project Surveyor <br />$185.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />Project Manager <br />$145.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />SUE Manager <br />$125.00 <br />N/A <br />N/A <br />N/A <br />per hour <br />CADD Supervisor <br />$120.00 <br />N/A I <br />N/A <br />N/A <br />per hour <br />SUE Supervisor <br />$90.00 <br />$135.00 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician III <br />$80.00 <br />$120.00 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician II <br />$75.00 <br />$112.50 <br />$120.00 <br />$160.00 <br />per hour <br />SUE Technician 1 <br />$70.00 <br />$105.00 <br />$120.00 <br />$160.00 <br />per hour <br />CADD Technician <br />$85.00 <br />$127.50 <br />N/A I <br />N/A <br />per hour <br />Administrative Support <br />1 $75.00 <br />$112.50 <br />N/A <br />N/A <br />per hour <br />Mobilization: Air -Vacuum Excavation Truck/Crew <br />$4.32 <br />$5.68 <br />$5.77 <br />$7.50 <br />per mile <br />Mobilization: Designating/Survey Truck/Crew <br />Per Diem <br />1 $3.02 <br />$4.081 <br />I GSA rates <br />$4.261 <br />$5.74 <br />per mile <br />Encroachment and Traffic Permits <br />actual cost <br />Subcontractors <br />cost plus 10% <br />Miscellaneous Expenses <br />cost plus 10% <br />P OSAL <br />