My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-09-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
FULL PACKET_2020-09-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 9:04:01 AM
Creation date
9/14/2020 8:46:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
585
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irp <br />BELOW <br />SUBSURFACE IMAGING <br />Port of Los Angeles <br />Los Angeles, CA 90731 <br />Project Scope: <br />14280 Euclid Ave <br />Chino, CA 91710 <br />1-888-90-BELOW <br />Certified SBE <br />C Below was hired to perform a massive 228 acre, (combined) Utility Investigation and Mapping effort at the <br />Port of Los Angeles over the course of five months. The project included CCTV Video Pipe Inspections of all <br />sewer and storm drain lines to record the pipes current conditions and exact locations. Over 250 potholes <br />were performed across the Port to visuallyverify all other existing utilities' horizontal and vertical specifications. <br />Additionally, by special request, a detailed analysis of all electrical and communication vaults was completed <br />to verify duct bank configurations across the entire site. The final Deliverable of the acquired utility details was <br />provided in 3D model created for the Port of Los Angeles. The model incorporates all current subsurface site <br />details and is being used as a reference for all new Port Construction projects. <br />Client: <br />C.A. Rasmussen <br />Sukut Construction <br />Griffith Company <br />Shimmick Construction <br />Contact: <br />Steven Reiser <br />Project Manager <br />(714)460-1083 <br />Project Duration: <br />Jan 2014- May 2014 <br />Combined Contract <br />Value: <br />$300,000.00 <br />Key Personnel: <br />Chris Loera <br />RFP No. 20-060 Subsurface Utility Engineering Services <br />*0 <br />25D-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.