Laserfiche WebLink
Irp <br />BELOW <br />SUBSURFACE IMAGING <br />Port of Los Angeles <br />Los Angeles, CA 90731 <br />Project Scope: <br />14280 Euclid Ave <br />Chino, CA 91710 <br />1-888-90-BELOW <br />Certified SBE <br />C Below was hired to perform a massive 228 acre, (combined) Utility Investigation and Mapping effort at the <br />Port of Los Angeles over the course of five months. The project included CCTV Video Pipe Inspections of all <br />sewer and storm drain lines to record the pipes current conditions and exact locations. Over 250 potholes <br />were performed across the Port to visuallyverify all other existing utilities' horizontal and vertical specifications. <br />Additionally, by special request, a detailed analysis of all electrical and communication vaults was completed <br />to verify duct bank configurations across the entire site. The final Deliverable of the acquired utility details was <br />provided in 3D model created for the Port of Los Angeles. The model incorporates all current subsurface site <br />details and is being used as a reference for all new Port Construction projects. <br />Client: <br />C.A. Rasmussen <br />Sukut Construction <br />Griffith Company <br />Shimmick Construction <br />Contact: <br />Steven Reiser <br />Project Manager <br />(714)460-1083 <br />Project Duration: <br />Jan 2014- May 2014 <br />Combined Contract <br />Value: <br />$300,000.00 <br />Key Personnel: <br />Chris Loera <br />RFP No. 20-060 Subsurface Utility Engineering Services <br />*0 <br />25D-91 <br />