My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-09-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
09/15/2020
>
FULL PACKET_2020-09-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 9:04:01 AM
Creation date
9/14/2020 8:46:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
585
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 2 <br />STEP TWO — FIELD INSPECTION (QUALIFYING PROJECTS ONLY) <br />Applicants submitting the most competitive Project Proposals will be further evaluated <br />during a field inspection, which may be conducted virtually. At the field inspection, <br />applicants should be prepared to respond to project -specific questions including, but not <br />limited to, the cost estimate, funding, site plan, program goals, site control, outreach <br />efforts, operations and maintenance, sustainability, partnerships, transportation, <br />community involvement, and any possible barriers to completion. <br />Applicants may be required to provide additional documentation about the project before <br />being granted a field inspection. <br />End of Step Two Information <br />12 <br />55B-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.